Routing For Repo Port, Dry Contacts, Parallel Ports, Usb Port & Rs-232 Port - Delta Modulon DPH Series User Manual

Hide thumbs Also See for Modulon DPH Series:
Table of Contents

Advertisement

4.1.13 Routing for REPO Port, Dry Contacts, Parallel Ports, USB Port
& RS-232 Port
NOTE:
1. Parallel, RS-232 and USB cables are standard accessories, but signal cables
2. In accordance with National Electrical Codes (NEC), please install a suitable
3. Please refer to national and local electrical codes for acceptable cable size.
4. Only when 5.4 Fixing the UPS is completed can you perform the following
5. The UPS has two different system cabinets, 20 ~ 80kVA and 20 ~ 120 kVA.
6. Cable ties are user-supplied and the quantity depends on on-site requirements.
A. Top Entry
Open the UPS's front door, remove the top covers shown in Figure 4-19 (each top cover
has two screws) and follow Figure 4-20 to perform top entry.
(20 ~ 120kVA UPS Internal View with Front Door Open)
Modulon DPH Series
for REPO port and dry contacts are user-supplied.
conduit and bushing for cable protection.
wiring actions.
Their top entry and bottom entry methods are the same; thus, in this chapter,
only the diagram of 20 ~ 120 kVA UPS is taken as an example.
(Figure 4-19: Top Covers' Location)
(20 ~ 120kVA UPS Internal View with Front Door Open)
(Each Cover Has Two Screws)
(Figure 4-20: Top Entry)
4-14
Top Cover × 2
Top Entry

Advertisement

Table of Contents
loading

Table of Contents