Installation Of Electrical Power And Data - Steelcase c:scape Manual

Non-sliding desk and supports
Hide thumbs Also See for c:scape:
Table of Contents

Advertisement

Installation of
Electrical Power
and Data
1.
Skip to Power and Data assembly instructions:
NOTE: Make sure to install the felt pad with the perferations in the felt
liner aligned /overlapping with the cutouts in the connect zone power
trough before installing any power &/or data into the desk understructure.
939549924 c:scape Modular Desk Power and Data
939549925 c:scape Desk Hardwire Power
939549926 c:scape Desk Connect Zone Power Strip
939549927 c:scape Receptacles - Desk, Base or Storage
CUTOUT
CUTOUT
Page 10 of 21
939505503 Rev A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the c:scape and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents