Parts List - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system (ess)
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

WARNING
Risk of chemical burns from electrolyte or toxic gases.
During standard operation, no electrolyte shall leak from the battery pack and no toxic gases shall
form. Despite careful construction, if the Battery Pack is damaged or a fault occurs, it is possible
that electrolyte may be leaked or toxic gases formed.
Ø
Do not install the system in any environment of temperature below -10°C or over 50°C and
in which humidity is over 85%.
Ø
Do not touch the system with wet hands.
Ø
Do not put any heavy objects on top of the system.
Ø
Do not damage the system with sharp objects.
Ø
Do not install or operate the system in potentially explosive atmospheres or areas of high
humidity.
Ø
Do not mount the inverter and the battery pack in areas containing highly flammable
materials or gases.
Ø
If moisture has penetrated the system (e.g. due to a damaged enclosure), do not install or
operate the system.
Ø
Do not move the system when it is already connected with battery modules.
Ø
Secure the system to prevent tipping with restraining straps in your vehicle.
Ø
The transportation of AlphaESS Storion-SMILE5 must be made by the manufacturer or an
instructed personal. These instructions shall be recorded and repeated.
Ø
A certified ABC fire extinguisher with minimum capacity of 2kg must be carried along
when transporting.
Ø
It is totally prohibited to smoke in the vehicle as well as close to the vehicle when loading
and unloading.
Ø
For the exchange of a battery module, please request for new hazardous goods
packaging if needed, pack it and let it be picked up by the suppliers.
Ø
In case of contact with electrolyte, rinse the affected areas immediately with water and
consult a doctor without delay.
CAUTION:
Risk of injury through lifting or dropping the system.
The inverter and battery are heavy. There is risk of injury if the inverter or battery is lifted incorrectly
or dropped during transport or when attaching to or removing from the wall.
Ø
Lifting and transporting the inverter and battery must be carried out by more than 2
people.
1.5 Parts List
Check the following parts list to ensure it is complete.
AlphaESS delivers a total system separately on site to client, this consists of:
___________________________________________________________________
Introduction
Alpha ESS Co., Ltd.
Your Smart Energy
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile5-batSmile-inv

Table of Contents