Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 35

Energy storage system (ess)
Table of Contents

Advertisement

Your Smart Energy
Installation
2.3.1.2 Three-phase in house
ADL-3000 three-phase connection (without CT, without meter plug), if applicable:
Figure 38 ADL-3000 three-phase Connect (without CT, without Meter plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
.
ADL-3000 three-phase connection (without CT, with meter plug), if applicable:
Figure 39 ADL-3000 three-phase Connect (without CT, with Meter plug)
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile5-batSmile-inv

Table of Contents