Your Smart Energy
Installation
gaskets..
Figure 18 Battery Installation – Second Battery Installation
Step 8: To assemble the second (and all other) battery, repeat steps 6 and 7,
respectively.
Figure 19 Inverter Mounting Panel Installation
Step 9: Remove the inverter mounting plate and bracket and connect them using the
M4 nuts as shown above. Check carefully if everything is tight.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 19