Step 10: Drill the corresponding holes into the wall with a drill and fix the inverter
mounting plate with screws on the wall and with the M6 nuts to the mounting plate of
the battery. The battery assembly is now complete.
2.2.2
Inverter Installation
Step 11: Please make AC cables on site.
Step 12-1: Please follow the AC cable requirements below.
For backup AC cables the stripping method is as following:
For grid AC cables the stripping method is as following:
Y
___________________________________________________________________
Page 20
Installation
Figure 20 Inverter Installation - Inverter Mounting Panel
Strip the insulation sheath of the three-core AC cable for about.
30mm. Strip L, N and PE cables for 6-7mm respectively.
Strip the insulation sheath of the three-core AC cablefor about
35mm. Cut L and N cable for 5mm. Strip L, N and PE cables 6-
7mm for respectively to make sure X-length is 5mm longer than Y-
length of L/ N cable.