Operation
Shutdown
– After disconnecting the patient
Switch the ventilator OFF:
1 To switch OFF, hold down the
approximately 3 seconds.
2 Press the rotary knob (B) to confirm the switch
OFF process.
When O
is supplied from a cylinder:
2
3 Close the cylinder valve.
WARNING
The cylinder valve must be closed completely
to avoid gas flow leakage by the device.
When medical gas is supplied from the pipeline
system:
4 Disconnect the high pressure connection from
the source.
62
Oxylog 3000
B
A
O
key (A) for
Instructions for Use Oxylog 3000 SW 1.n