1.
Install the replacement battery with the positive (+) side facing the nearby SP.
Return the server module to operation.
2.
See
"Returning the Server Module to Operation" on page
3.
Access the Oracle ILOM prompt.
See
"Log Into Oracle ILOM (Service)" on page
4.
Set the clock's day and time.
99.
21.
Servicing the Battery
Install the Battery
93
Need help?
Do you have a question about the SPARC T5-1B and is the answer not in the manual?
Questions and answers