Install The Left And Right Cylinder Hoses - Raven AutoBoom Installation Manual

For redball 690
Hide thumbs Also See for AutoBoom:
Table of Contents

Advertisement

Chapter 3
Install the 9/16" JIC M/M/F swivel run tee adapter fitting (P/N 333-0012-043) in port T of the machine's
8.
hydraulic valve.
Connect the machine's tank hose to the opposite end of the installed tee fitting.
9.
Install the 90° end of the supplied hydraulic hose (P/N 214-1000-292) to the fitting installed in Port T of the
10.
AutoBoom valve.
Connect the straight end of the installed hydraulic hose to the 90° end of the installed tee fitting in port T of
11.
the machine's hydraulic valve.

Install the Left and Right Cylinder Hoses

Left and Right Cylinder Hoses Installed
FIGURE 6.
Disconnect the machine's cylinder up hoses from the machine's tilt cylinders.
1.
Connect the machine's left cylinder hose to the installed fitting in Port LV of the AutoBoom valve.
2.
Connect the machine's right cylinder hose to the installed fitting in Port RV of the AutoBoom valve.
3.
Install the straight end of the supplied hydraulic hose (P/N 214-1000-291) to the installed fittings in Port LC
4.
of the AutoBoom valve.
Connect the 90° end of the installed hydraulic hose to the machine's left tilt cylinder.
5.
Install the straight end of the supplied hydraulic hose (P/N 214-1000-291) on the installed fittings in Port RC
6.
of the AutoBoom valve.
Connect the 90° end of the installed hydraulic hose to the machine's right tilt cylinder.
7.
12
Redball 690 AutoBoom Installation Manual

Advertisement

Table of Contents
loading

Table of Contents