Connect The Controller (If Applicable); Connect The Field Computer (If Applicable); Connect The Power Leads - Raven AutoBoom Installation Manual

For redball 690
Hide thumbs Also See for AutoBoom:
Table of Contents

Advertisement

Chapter 4

Connect the Controller (If Applicable)

Route the controller cable (P/N 115-0230-007) into the right side of the machine's cab.
1.
Locate the two controller connectors and connect them to the AutoBoom controller (P/N 063-0130-011).
2.
Note:
The AutoBoom controller should be mounted in the machine's cab so that the operator has easy
access to it.

Connect the Field Computer (If Applicable)

Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 35 for
installation and wiring instructions for your specific field computer.

Connect the Power Leads

Locate the power cable that has the red and white power leads at one end.
1.
Disconnect the machine's connectors from the battery terminals.
2.
Install the red power lead on the positive battery terminal and reinstall the machine's battery connector.
3.
Install the white power lead on the negative battery terminal and reinstall the machine's battery connector.
4.
34
Redball 690 AutoBoom Installation Manual

Advertisement

Table of Contents
loading

Table of Contents