Alpha ESS SMILE5 AU Installation, Operation & Maintenance Manual page 19

Energy storage system (ess)
Table of Contents

Advertisement

INSTALLATION
Patch Cable recommend CAT5
Meter Port
ś
PV
SMILE-B3
LOAD3
SMILE5
BACKUP
AC
Ś
PV-INV
PV
meter
Figure 55 Backup Box Connect to SMILE5 (single phase grid in house)
For more details please refer to the quick installation manual of backup box.
2.3.5 Meter setting
2.3.5.1 SM60A
There are 3 buttons on the front of the
electricity meter:
1. Down arrow: shift button
2. Up arrow: value adjustion
3. Enter button / Menu button
LOAD2
LOAD1
meter patch cable
for backup box
L
N
PE
DSP_BackupBox
33
34
Step 1:
Click the "Enter" button to enter the
menu interface.
Step 3:
You will get into the code interface.
Then click the "Shift" button to enter the
address interface..
GRID
Step 5:
Click the "Enter" button to get back
to the menu interface. Then click the "Shift"
button 5 times to enter the save interface.
2.3.5.2 ADL3000
INSTALLATION
Step 2:
Click the "Enter" button to input
the password. The initial password is
0000. Then click the "Enter" button.
Step 4:
Please set the meter address by
using the "Value adjustment" button, the
Grid meter (DC, AC and Hybrid system)
address is set to 003, and the PV meter (AC
and Hybrid system) address is set to 004.
Step 6:
Click the "Shift" button to save the
setting.
There are 4 buttons on the front of the
electricity meter:
1. Enter button / Energy button
2. Down arrow / Power button
3. Up arrow / Voltage & current button
4. SET button