Alpha ESS SMILE5 AU Installation, Operation & Maintenance Manual page 17

Energy storage system (ess)
Table of Contents

Advertisement

INSTALLATION
ADL-3000 single-phase connection (with CT, without meter plug), if applicable:
Figure 44 ADL-3000 single-phase Connect (with CT, without Meter plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
ADL-3000 single-phase connection (with CT, meter plug), if applicable:
Figure 45 ADL-3000 single-phase Connect (with CT, with Meter plug)
2.3.2.2 Three-phase in house
ADL-3000 three-phase connection (without CT, without meter plug), if applicable:
Figure 46 ADL-3000 three-phase Connect (without CT, without Meter plug)
29
LOAD
LOAD
30
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
ADL-3000 three-phase connection (without CT, with meter plug), if applicable:
Figure 47 ADL-3000 three-phase Connect (without CT, with Meter plug)
ADL-3000 three-phase connection (with CT, without meter plug), if applicable:
Figure 48 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
ADL-3000 three-phase connection (without CT, with meter plug), if applicable:
Figure 49 ADL-3000 three-phase Connect (with CT, with Meter plug)
INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile5

Table of Contents