Commissioning
8.1
Safety measures to be taken before commissioning
Familiarize yourself with the
–
operator and system controls of the measuring system
–
equipment of the measuring system
–
operation of the measuring system
–
immediate environment of the measuring system
–
and the measures for an emergency
–
use your personal protective equipment.
Carry out the following activities before commissioning the measuring system:
–
Check and make sure that all safety devices are attached and are working.
–
Inspect the measuring system for visible damage; rectify any detected defects
immediately or notify supervisory staff of them– the measuring system must only be
operated in a perfect state.
–
Check and ensure that only authorized persons are in the work area of the measuring
system.
–
Remove all objects and other materials that are not needed to operate the measuring
system out of its work area.
8.1.1
Necessary operating and maintenance space
When choosing the installation site, observe the ambient conditions (see 3.3.3).
When choosing the installation site, make sure there is enough operating and traffic
space.
8.1.2
Floor requirements
WARNING
Wheel alignment system SetupWizzard
Loss of stability
A loss of stability of the setup platforms may result in a significant risk of
injury.
–
The floor must be straight and level.
–
The
floor
must
The plant operator is responsible for the structural stability of the floor.
have
the
necessary
load
capacity.
37