1 SPINNER DOME
TORQUE
2 FILLER PLATE
20 TO 25
3 SPINNER ATTACHMENT SCREW
IN LBS
SEE
4 LOW PITCH STOP SCREW
SEE
5 PROPELLER HUB
NOTE 1
6 PROPELLER BLADE
7 SPINNER BULKHEAD
8 BULKHEAD ATTACHMENT BOLT,
WASHER. SPACER AND NUT
FLUSH
9 PROPELLER HUB CHAFING RING
10 CLAMP (SEE NOTE 3)
11 SAFETY WIRE
RAISE
NOTES
1 APPLY GENEROUS BRUSH COATING OF EC776TO EN
TIRE CIRCUMFERENCE OF PROPELLER HUB FOR DIS.
-
-
TANCE SHOWN INSTALL PROPELLER HUB CHAFING
RING WITHIN 10 MINUTES OF APPLICATION OF
SEE
COATING
NOTE 2
2 LOCATION OF BOLT HOLE MARKED "O" WHEN #1 PIS-
TON IS ON TOP DEAD CENTER INSTALL PROPELLER
WITH BLADES INDEXED WITH BOLT HOLES AS SHOWN
SEE NOTE 4
3 CLAMPS SHOULD BE INSTALLED WITH THE WORM
VIEW A-A
GEAR HOUSINGS 1 80° OPPOSITE TO EACH OTHER
RAISED
4. "O" HOLE REQUIRES RAISED BUSHING. ALL OTHER
BUSHINGS ARE AS INDICATED.
Figure 61-5. Three Blade Propeller Installation (PA-32-301T)
PIPER AIRCRAFT
PA-32-301/301T
MAINTENANCE MANUAL
TORQUE
60 TO 70
FT LBS
AISED
FLUSH
61-10-02
Page 61-05
Revised: August 9. 1984
2I8