Cutting Unit Overhaul - Toro Reelmaster 216 Service Manual

Hide thumbs Also See for Reelmaster 216:
Table of Contents

Advertisement

Cutting Unit Overhaul (Fig. 19, 20)
Loctite
It is recommended that the following new parts be
installed when overhauling a cutting unit. These parts
are available in an overhaul kit (Fig. 19):
Rubber bushings (Item 8)
Nylon flanged bushings (Item 9)
Thrust bearings (Item 18)
Seals (Item 20)
Bearings (Item 30)
Bushing assemblies (Item 38)
Flanged bushings (Item 39)
Special screws (Item 44)
Service and Repairs
Anti-seize
compound
Anti-seize
compound
Torque to
200 in-lb
Anti-seize
compound
Figure 19
(8 blade floating cutting unit shown)
Page 9 - 16
Anti-seize
compound
Anti-seize
compound
both ends
When assembling cutting unit, apply anti-seize com­
pound in the following locations (Fig. 19):
Pivot pins on both ends of bedbar (Item 46).
Tapered end of setscrew (Item 49).
Stud on bedbar housing (Item 43).
Both ends of reel shaft (Item 54).
Handle threads (Item 19).
Threaded hole in S.P.A. pin (Item 22).
To bores before installing bushings (Item 8, 38)
Bore of reel bearings (Item 30).
Use Loctite on capscrew (Item 34) that retains pulley
and spacer.
Torque to
35 ft-lb
®
Reelmaster
216/216-D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 216-d

Table of Contents