Toro Reelmaster 216 Service Manual page 44

Hide thumbs Also See for Reelmaster 216:
Table of Contents

Advertisement

TEST HOOK-UP NO. 1: Charge Pump Flow and Implement Relief Pressure (Fig. 14, 15, 16)
(Using Tester With Pressure and Flow Capabilities)
Tester Connection
Connect tester in series between implement pressure
port of hydrostatic pump and pressure inlet port of lift
valve (Flow Control Open).
Reelmaster 216: Install tester between hose and
fitting at front of valve.
Reelmaster 216-D: Install tester between hose and
fitting at bottom front of pump.
TEST A: Charge Pump Flow and
Implement Relief Pressure
1. Operate engine at full speed:
3600 ± 100 RPM
Reelmaster 216:
3200 ± 100 RPM
Reelmaster 216-D:
2. Make sure hydraulic oil is at operating temperature.
3. Traction pedal and lift valve in neutral. Parking brake
engaged.
4. While watching flow and pressure gauges, slowly
close flow control valve until flow gauge reads 1 GPM.
TESTER READINGS: GPM Flow — Not less than 1
GPM at Minimum 500 PSI.
CAUTION
Implement relief pressure should not exceed
800 PSI.
Testing
Reelmaster 216 valve connections
Reelmaster 216-D pump connections
(Reelmaster 216 2WD shown)
Page 5 - 18
Figure 14
Figure 15
Figure 16
®
Reelmaster
216/216-D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 216-d

Table of Contents