Option 2, Code Kf1; Adaptation To The Cable Length - HBM T10FS Operating Manual

Torque flange
Hide thumbs Also See for T10FS:
Table of Contents

Advertisement

36

5.3 Option 2, code KF1

The stator housing has a 7‐pin (Binder 723) device connector, to which you
link the connection cable for voltage supply and torque signal.
Conn.
Binder
Binder 723
6
1
5
7
2
3
4
Top view

5.3.1 Adaptation to the cable length

The transmission method between the rotor and the stator determines the
function of the torque flange, which is dependent on:
 the installation situation (for example, covering, area free of metal parts)
 the length of the cable
 the tolerances of the excitation voltage supply
To allow for adaptation to the various conditions, there are three switches in
the stator housing, which can be accessed by removing the stator cover (see
Fig. 5.1).
HBM
Assignment
Pin
1
Supply voltage zero
2
No function
3
Pre‐amplifier supply voltage (+15 V)
4
Torque measurement signal (12 V
5...15 kHz)
5
No function
6
Rotor excitation voltage (54 V/80 V
approx.15 kHz)
7
Rotor excitation voltage (0 V)
Shielding connected to housing ground
Wire
MS3106
color
wh
bk
bu
;
rd
PP
;
gn
PP
gy
A0785-1.4 en
T10FS
conn.
Pin
A
B
C
D
F
G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents