Chapter 3: Gtr 8000 Base Radio Installation; Pre-Installation Tasks; Equipment Installation Process Overview - Motorola ASTRO 25 GTR 8000 Manual

Base radio
Hide thumbs Also See for ASTRO 25 GTR 8000:
Table of Contents

Advertisement

MN003286A01-E

Chapter 3: GTR 8000 Base Radio Installation

Chapter 3
GTR 8000 Base Radio Installation
This chapter details installation procedures relating to GTR 8000 Base Radio.
3.1

Pre-Installation Tasks

Follow this process to perform the installation tasks. Ensure that you have the following:
Appropriate cables
Access to Software Download Manager (SWDL), Configuration/Service Software (CSS), and the
Unified Network Configurator (UNC)
IP/DNS information
Login and password information
3.1.1

Equipment Installation Process Overview

Process:
1 Prepare the site to comply with the Motorola Solutions requirements and specifications for the
equipment, as listed in the Standards and Guidelines for Communication Sites manual. The
base radio may be installed in a suitable, restricted access, indoor enclosure in any location
suitable for electronic communications equipment. Other codes and guidelines that may apply to
the location must also be met. See
2 Inspect and inventory all racks, cabinets, cables, and other equipment with a Motorola Solutions
representative to ensure that the order is complete. See
Guidelines on page
3 Various tools are used to install and service the equipment. If information is needed regarding
where to obtain any of the equipment and tools listed, contact the Motorola Solution Support
Center (SSC). See
recommended tools for installing and servicing the hardware.
4 Install all equipment using the site drawings and other documents provided by the Field
Engineer. Use the installation standards and guidelines for placing and installing equipment.
5 Properly ground all the racks and cabinets to protect against ground faults, electrical surges, and
lightning. See
GTR 8000 Base Radio Hardware Installation on page
6 Connect all necessary cables within a rack and between the racks for system interconnection.
See
GTR 8000 Base Radio Rear Connections (Integrated Voice and Data) on page
8000 Base Radio Rear Connections (HPD) on page
Connections on page
7 Run a preliminary check of a site before applying power.
8 See
Installing Device Software Prerequisites on page 121
before installing the software.
9 See
Installing Devices in the UNC on page 124
software images from the UNC.
82
General Safety Precautions on page
86.
General Installation/Troubleshooting Tools on page 92
110.
General Installation Standards and
94.
108, and
GTR 8000 Base Radio Front
for a list of items you need access to
to discover the base radio and to load OS
83.
for a list of general
105,
GTR

Advertisement

Table of Contents
loading

Table of Contents