General Equipment Inspection And Inventory Recommendations; General Placement And Spacing Recommendations - Motorola ASTRO 25 GTR 8000 Manual

Base radio
Hide thumbs Also See for ASTRO 25 GTR 8000:
Table of Contents

Advertisement

Activity
Determine site access
and security.
Review safety consid-
erations.
Schedule installation
of telephone service.
Review grounding
specifications.
Schedule installation
of site power.
3.3.2

General Equipment Inspection and Inventory Recommendations

Take an inventory of all equipment with a Motorola Solutions representative to ensure that the order is
complete. Carefully inspect all equipment and accessories to verify that they are in good condition.
Promptly report any damaged or missing items to a Motorola Solutions representative.
CAUTION: Do not tamper with factory configuration settings for these devices. These settings
include software configuration, firmware release, password, and physical connections. Motorola
Solutions has configured and connected these devices to meet specific performance
requirements. Tampering with these devices may result in unpredictable system performance or
catastrophic failure.
3.3.3

General Placement and Spacing Recommendations

When placing equipment at a site, perform the following:
Place each rack on a firm, level, and stable surface, and bolt the racks together.
Use correct mounting hardware and shims to prevent rack movement.
Description of Activity
Minimizes cable lengths.
Determines the location of tele-
com equipment.
Outlines of site access and securi-
ty measures.
Outlines general, installation, and
environmental safety guidelines
and requirements and OSHA-relat-
ed considerations.
Ensures options and functions of
on-site, two-way communications
for personnel safety and mainte-
nance.
Ensures that the site meets or ex-
ceeds the Quality Audit Checklist
in Appendix F as well as the Power
and Grounding Checklist in Appen-
dix D.
Covers grounding, power sources,
and surge protection.
Chapter 3: GTR 8000 Base Radio Installation
Chapter Reference
Chapter 2 "Site Design and De-
velopment"
Chapter 3 "Communications
Site Building Design and Instal-
lation"
Chapter 3 "Communications
Site Building Design and Instal-
lation"
Appendix D. "Grounding (Earth-
ing) Electrode System Testing/
Verification"
Appendix F. "R56 Compliance
Checklist"
Chapter 4 "External Grounding
(Earthing)"
Chapter 5 "Internal Grounding
(Earthing)"
Chapter 6 "Power Sources"
Chapter 7 "Surge Protective
Devices"
MN003286A01-E
87