Elevator - Control Horn Installation - Seagull Models SPARROW HAWK 1.6-2.0 Assembly Manual

Table of Contents

Advertisement

Covering strip.
INSTALLING HORIZONTAL FIN.
1) Remove the covering as same as
pictures shown below.
2) Sand the aluminium tube using
sandpaper. This will improve the bond of the
epoxy to the cardboard horizontal fin.
Coat both sides of one half of the aluminium
tube with 30 minute epoxy. Next, pour some
epoxy into the cardboard horizontal fin. Use
enough epoxy to fill any gaps.
Epoxy.
3) Insert aluminium tube into the
cardboard of fuselage.
www.seagullmodels.com
together and carefully align them at
possition on the fuselage. Wipe away any
excess epoxy using paper towels.
Hinge.
C/A glue.
Hinge.
C/A glue.
the same method as with the aileron control
horns.
the both side of elevator.
Epoxy.
Epoxy.
4) Slide the two horizontal fin halves
Epoxy.
ELEVATOR - CONTROL HORN
INSTALLATION.
1) Install the elevator control horn using
2) Position the elevator control horn on
3x45mm.
Horizontal fin.
the
Epoxy.
2 sets.
Elevator.
15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARROW HAWK 1.6-2.0 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sea 71

Table of Contents