Completion of Startup Procedure
When the steps described in the above sections have been carried out, the transmitter is
ready for operation. Each transmitter receives a test report from the final testing department
complete with measurement data on every quality parameter. This means that on site com-
pliance testing is only necessary at the customer's request.
3.1
Final Steps
3.1.1
Checking R&S NETCCU800 Status Display
1. Select NetCCU > Status > Device Status.
The Device Status window opens.
2. Check the status of the warning and fault indicators.
If a transmitter is ready to operate, no warnings or faults will be signaled.
3. Select NetCCU > Status > RF Status.
The RF Status window opens.
4. Check the status of the warning and fault indicators.
If a transmitter is ready to operate, no warnings or faults will be signaled.
2098.0188.72
Chapter 4
- 4.26 -
Commissioning