Requirements; Operating R&S Netccu800 - R&S N 8000 Series System Manual

Dtv transmitters atsc
Table of Contents

Advertisement

1.2

Requirements

1. Before switching on the transmitter, check whether the exciter is set to the correct fre-
quency (consistent with any diplexer or bandpass filter that may be connected).
If the transmission frequency is not yet known, the transmitter should remain switched
off until the frequency is set.
2. Connect an antenna to the RF output.
Switching on transmitter
Switch on the transmitter as follows:
1. Switch on the main switch (Q1).
2. Switch on the exciter
The exciter boots up.
3. Switch on the R&S NetCCU800 (F3).
The R&S NetCCU800 boots up.
4. Switch on the auxiliary power supply unit (F5).
5. Switch on the fan fuse for fan 1 (F6) and for fan 2 (F7).
6. If necessary, switch on additional units (F4) and peripheral units (F8).
1.3
Operating R&S NetCCU800
Detailed information on operating the R&S NetCCU800 can be found in the chapter "Oper-
Note
ating".
2098.0188.72
Chapter 4
(F1
or F2).
- 4.2 -
Commissioning
E-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nv830 seriesNv8301Nv8302Nv8303Nv8304

Table of Contents