Unpacking The Unit; Removing A Top Cover - Delta 100kW PCS Installation Manual

Power conditioning system
Table of Contents

Advertisement

Unpacking the Unit

Use a forklift to move and place the crate containing the 100kW PCS and the wooden pallet on a
designated location. Make sure the location is clean and prepared prior to moving the crate.
WARNING!
!
The 100kW PCS and crate have a combined weight of approximately 418 kg/921 lbs. DO
NOT attempt to lift and/or move the package/unit by hand. The unit is extremely heavy.
Attempting to move the unit by hand may lead to injury, damage, and even possibly death.
WARNING!
!
To prevent injury or damage, make sure to check the shockwatch and tiltwatch indicators
throughout the unpacking process.
1. Use a ladder to reach the top of the 100kW PCS.
2. Remove the screws securing the top cover.
3. Remove the top cover.
Installation Manual
ON
OFF
STAN
DBY
RUN
FAUL
T
DC
DIS
CO NN
EC T
ON
OFF
AC
DIS
CO NN
EC T
ON
OFF
Figure 9. Removing a Top Cover
12
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents