6. Locate the top cover, see the following figure and remove the screws from the front and rear
sides.
7. At least two individuals are required to safely lift the top cover. Lift both ends simultaneously and
remove the top cover from the PCS. Place the cover in a clean work surface as it is needed for
the final phase of the installation.
Installation Manual
Figure 17. Removing the Top Cover