Chain Hoist Installation - Delta 100kW PCS Installation Manual

Power conditioning system
Table of Contents

Advertisement

Chain Hoist Installation

CAUTION!
!
T
100
O MOVE THE
.
CAPACITY
CAUTION!
!
I
F USING LIFTING LUGS
TO THE HOOD AND BE SURE TO USE A MINIMUM OF FOUR STRAPS OF SUFFICIENT LENGTH
1. Unpack the 100kW PCS, see "Unpacking the Unit" on page 12.
2. Remove the hexagonal nuts and washers securing the 100kW PCS to the shipping pallet.
CAUTION!
!
M
AKE SURE THE SWITCH IS OFF
Installation Manual
W PCS,
K
USE LIFTING EQUIPMENT THAT HAS APPROPRIATELY RATED LIFT
,
BE SURE THE SPREADER BAR IS SUFFICIENTLY LONG TO PREVENT DAMAGE
ON
OF F
STAN
DBY
RUN
FAU
LT
DC
DI SC
ON NE
CT
ON
OF F
AC
DI SC
ON NE
CT
ON
OF F
Figure 12. Detaching PCS from a Pallet
(
POWERED OFF
17
)
BEFORE OPENING THE FRONT PANEL
Installation
.
.