Front/Rear Side Handling - Delta 100kW PCS Installation Manual

Power conditioning system
Table of Contents

Advertisement

d. Align the forklift with the bottom channels on the cabinet, see the following image.
e. Once aligned, insert the forks into the channels until they are completely through the
opposite side of the insertion channels.
WARNING!
!
Take care the unit is balanced and no risk to prevent it fell.
f.
Carefully lift the cabinet.
3. Once the cabinet is secured to the location, install the top cover, see "Securing a Cabinet in a
Final Location" on page 30.
Installation Manual
ON
OF F
STAN
DBY
RUN
FAU
LT
DC
DI SC
ON NE
CT
ON
OF F
AC
DI SC
ON NE
CT
ON
OF F
Figure 28. Front/rear Side Handling
29
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents