Delta M70A-262 Operation And Installation Manual

Delta M70A-262 Operation And Installation Manual

Grid-tie transformerless solar inverter
Table of Contents

Advertisement

Quick Links

The power behind competitiveness
Grid-tie Transformerless Solar Inverter
M70A_262
Operation and Installation Manual
English
1
87
繁體中文
www.deltaww.com

Advertisement

Chapters

Table of Contents
loading

Summary of Contents for Delta M70A-262

  • Page 1 The power behind competitiveness Grid-tie Transformerless Solar Inverter M70A_262 Operation and Installation Manual English 繁體中文 www.deltaww.com...
  • Page 3: Table Of Contents

    Contents ......... . . 1 Safety .
  • Page 4   4.3  Delta Function Setting ........
  • Page 5 Figure ........Figure 2-1: Components .
  • Page 6 ....... . . Figure 4-6: Steps of set country ....... . . Figure 4-7: False of set country .
  • Page 7 Table ........Table 2-1: Packing list .
  • Page 8: 1 Safety

    DELTA ELECTRONICS, INC. Service engineers and end users may not divulge the information contained herein or use this manual for purpose other than those strictly connected with correct use of the product.
  • Page 9: General Safety

    This user manual provides important instructions for Delta grid-tie transformerless solar inverter. The product is designed, tested, verified, and certified according to international safety requirements, certifications, and standards but precautions must be observed when installing and operating the product.
  • Page 10: Symbols

    Safety 1.2.2 Symbols This section describes the definition of the symbols in this manual. In order to prevent both personal injury and property damage, and to ensure long-term operation of the product, please read this section carefully and follow all the safety instructions while you use the product. DANGER! - This warning indicates an immediate hazard which will lead to death or serious injury.
  • Page 11 Safety INFORMATION - An exclamation mark enclosed in a double circle indicates additional important information is contained in the following section and the user should follow the instructions to prevent any hazards. DANGER : ELECTRICAL HAZARD!! - This warning indicates an immediate electrical hazard that unheeded can lead to death or serious injury.
  • Page 12: 2 Introduction

    The user manual is valid for the following device types: • M70A_262 This user manual must be followed during installation, operation, and maintenance. DELTA reserves the right to make modifications to the content and technical data in this user manual without prior notice.
  • Page 13: Product Overview

    ⑦ ⑧ ⑨ ⑩ Figure 2-1: Components Table 2-1: Packing list M70A_262 Object Description Delta Solar Inverter 1 pc Solar inverter Wall mounting bracket 1 pc Mounting Bracket (Material: Aluminum/Thickness: 3mm) Important instructions for solar inverter. User Manual 1 pc Safety instructions should be followed during installation and maintenance.
  • Page 14 Introduction External Antenna Wi-Fi module Fans Bracket SUB_1G Antenna wiring port DC Switch AC Output RS-485 Toggle Latch Wi-Fi Antenna DC Input (H4) (option) x 12 strings Figure 2-2: Overview...
  • Page 15 (防護等級/防护等级) Over Voltage Category : AC:III / DC:II (過電壓等級/过电压等级) Made in China Authorized representative VDE-AR-N 4105 Delta Electronics (Netherlands) B.V. Zandsteen 15, 2132 MZ Hoofddorp, VDE-AR-N 4110 The Netherlands IP65 60 seconds Figure 2-3: Rating label Table 2-2: Rating label explanation...
  • Page 16 Introduction Figure 2-4: External/ internal view...
  • Page 17 Introduction ⑭ ⑬ ⑦ ⑮ ⑫ ⑪ ④ ⑨ ⑩ ⑥ ① ③ ⑤ ② ⑧ Figure 2-5: layout Table 2-3: layout description Component Component Component 2.8” cable opening for AC Communication port Outter fan Type II DC SPD Wi-Fi (option) AC terminal Type II AC SPD Wi-Fi gland...
  • Page 18: 3 Installation

    Installation 3 Installation CAUTION ! - In some locations, mounting the inverter in direct sunlight may cause the inverter to enter a thermal derating mode. To eliminate this concern, a shade structure over the inverter chassis may be necessary. WARNING ! - Do not install the unit near or on flammable surfaces.
  • Page 19: Unboxing & Review

    Installation 3.1 Unboxing & Review Unpacking the case, please follow the order of Figure 3-1. It could be transported by 2 people (Figure 3-2) . For ground mount installation It is recommended to install the grounded brackets first at this step. For detailed installation methods, Need more than please see section 3.2.2.
  • Page 20 Installation Prohibit to force with Prohibit to force with Prohibit to force with fan shutter. DC connector. DC switch. Prohibit to force with AC gland. Figure 3-2: Handle position for handling...
  • Page 21: Mechanical Installation

    Installation 3.2 Mechanical Installation This unit is designed to be wall-mounted per Section 3.2.1 or ground mounted Section 3.2.2. 3.2.1 Vertical Wall Mount Refer to Figure 3-4 to Figure 3-9. 1. Ensure the surface to which the unit is to be mounted is sufficiently strong enough to carry the weight.
  • Page 22 Installation 699 mm 264 mm Figure 3-3: Inverter dimensions unit: mm Figure 3-4: Mounting bracket dimensions...
  • Page 23 Installation Required position of at least 8 screws for mounting bracket Figure 3-5 : Positions of mounting screws >200mm Figure 3-6: Permitted mounting positions...
  • Page 24 Installation Figure 3-7: Prohibited mounting positions Wall > 990mm > 240mm > 415mm > 840mm > 700mm Inverter #1 Inverter #2 > 1300mm > 400 > 708mm > 470mm > 690mm* * If wiring without door. (To remove the door, please refer to section 3.3) Figure 3-8: Required mounting clearances...
  • Page 25 Installation Wall Without Clapboard >200mm >200mm >300mm >600mm >300mm >60mm * >60mm * * If the installation location has a risk of flooding or accumulated snow, please raise the appropriate height of the inverter. Install Clapboard Clapboard dimension 200mm >830mm >150 >150 >380mm...
  • Page 26: Ground Mount (Option)

    Installation 3.2.2 Ground Mount (Option) Buy the spare parts of grounded brackets if ground mounted. 1. Ensure the grounded base to which the unit is to be mounted is sufficiently strong enough to carry the weight. 2. The grounded base horizontally (perpendicular to the floor), and mark required mounting hole locations per Figure 3-11.
  • Page 27 Installation Φ15 mm 310 mm 458 mm height * * If the installation location has a risk of flooding or accumulated snow, please raise the appropriate height of the inverter. Figure 3-11: To secure inverter grounded brackets to ground-mounting base...
  • Page 28: Door

    Installation 3.3 Door In order to ensure the normal long-term operation of the inverter, please follow the procedures in Section 5.1 to open and close the door. If the installation space is too narrow for the wiring operation, please remove the door according to Figure 3-12.
  • Page 29: Ac Grid Types And Connections

    Installation 3.4.1 AC Grid Types and Connections ATTENTION The default AC Grid connection is 3Ø-3W. It can also connect 3Ø-4W with Neutral (N). The inverter will operate from the following grid connections without need of an external transformer: TNC system TNC-S system 230/400V 230/400V...
  • Page 30 Installation M70A_262 support Cu stranded wire, Cu flexible conducor, Al stranded wire and aluminum solid (include sector wire). Cu stranded Cu flexible wire Al stranded Aluminum solid (need press with terminal) (sector) * • Cu: The Cu flexible wire need stamp with terminal, for the other model wiring with bear wire is available.
  • Page 31: Ac Side -Prewire Set-Up

    Installation Figure 3-13: AC Gland with multiple inlet Table 3-1: Cable size comparison table Sizes of Cables (mm) Torque (N• m) Dimension of P (mm) 51-57 2550 mm 43-50 1962 mm 36-43 1450 mm 30-36 1017 mm 26-30 706 mm 3.4.4 AC Side –Prewire Set-Up Prior to installing conductors on terminal complete the following procedure to make terminals ready for connections.
  • Page 32: Ac Wiring

    Installation 3.4.5 AC Wiring Refer to Figure 3-12 in Section 3.4 for the procedure to prepare AC conductors for connection to the AC terminals. Ensure the AC conductors used are sized to the correct ampacity per NEC or other local code. After inserting conductor, torque terminal nut by 31 N •...
  • Page 33: Electrical Installation For Dc Wiring

    Installation 3.5 Electrical Installation for DC Wiring DANGER : ELECTRICAL HAZARD!! - PV array converts sunlight into electric power with high DC voltage and high   DC current which can cause dangerous electrical shock hazard! - Use an opaque material to cover the PV array before wiring or cabling. - Ensure the correct polarities are connected when DC cabling is applied.
  • Page 34: Dc Wiring Installation

    Installation 3.5.1 DC Wiring Installation Please read the following instructions for connecting DC connector : • Ensure the DC conductors used are Cu and sized to the correct ampacity per NEC or other local code • Strip off all wires for 6.5~7.5 mm. •...
  • Page 35 Installation SWITCH 1 SWITCH 2 Figure 3-16: location of H4 connectors to connect array wiring (DC)
  • Page 36 Installation PUSH PUSH To prop up connectors, frames should be installed beneath. Figure 3-17: Installation methods for protective frame...
  • Page 37: Equipment Grounding

    Installation 3.5.2 Equipment Grounding To ground the inverter, please crimp the grounding wire to ring terminal lug and fix it on the grounding point shown as figure 3-18. Screw torque: M6/ 3.9 N•m Figure 3-18: Mount the equipment grounding...
  • Page 38: Antenna

    Figure 3-19 ~ 3-21. ATTENTION - Always keep nut and screws properly tightened on the case. Water leakage may cause serious damage. Contact DELTA service when lack for nut and screws. - Store the nut for spare usage. Antenna Location Save the nut after antenna installed.
  • Page 39 Installation >20cm There must be no obstacles within 20 cm around the antenna. Keep antenna pointing upright. Figure 3-20: Attentions of installing antenna...
  • Page 40 Installation 1. Turn the antenna counterclockwise by about 45 degrees. 2. Put on the antenna bracket. 3. Turn the antenna to the proper position. 4. Tighten the 3 screws to antenna bracket. ① ② ③ ④ Screw locations * Screw torque: M4 / 0.98 N • m Figure 3-21: Install antenna bracket ATTENTION - Please refer Data Collector manual for connection of Data Collector.
  • Page 41: Communication Module Connections

    Installation 3.7 Communication Module Connections The communication module of M70A is shown in Figure 3-22. It provides VCC, RS-485, dry contact, EPO, and Digital Input terminals for use in various applications. Details for each are presented below. There's a 12VDC source between VCC & GND for use with external device. VCC *1 &...
  • Page 42 Installation Please refer to the chapter 5.1 and open the door, the communication module is at the red circle that is shown in Figure 3-23. Figure 3-23: Location and access to Communication Module...
  • Page 43: Connection

    Installation 3.7.1 RS-485 Connection The pin definition for the RS-485 terminal block is shown in Table 3-2. - Pins 1 and 2 provide a 12VDC / 0.5A bus for use with accessories. - Pins 3 and 5 are both connected to the DATA+ input. - Pins 4 and 6 are both connected to the DATA - input.
  • Page 44 Installation Terminal Resistor 120Ω(1/2W) DATA+ to DATA- RS485/USB RS485/RS232 Figure 3-24: Multiinverter connection illustration Termination switch Table 3-3: Bus Termination switch settings Switch 1 Terminal Resistor ON Terminal Resistor OFF...
  • Page 45: Epo Function & Digital Input

    3.7.2 EPO Function & Digital Input The communication Module has an Emergency Power Off function (EPO). Users can customize EPO function in APP or Delta Solar System (DSS). VCC K0 K1 K2 K3 K4 K5 K6 Figure 3-25: EPO function terminal block Once enabled, the EPO function can be used to turn off the inverter via a NO relay contact connected across terminal [VCC &...
  • Page 46: Dry Contact Connection

    Installation 3.7.3 Dry Contact Connection M70A_262 provide dry control contact pairs that may be used to control external devices based on the status of operation of the inverter. The terminal block for this function is shown in Figure 3-26. The terminals marked in the figure identify the dry contact connection.
  • Page 47: On-Site Insulation Test

    Installation 3.8 On-Site Insulation Test For customers who want to do on-site insulation test, please make sure: 1. The DC switches are in “OFF” position. 2. Apply one probe to the positions shown in Figure 3-27, the other to the ground. It might cause damages to the inverter if probes are applied to inappropriate positions.
  • Page 48: 4 Commissioning

    Commissioning 4 Commissioning CAUTION : HOT SURFACES, DO NOT TOUCH! - Use care to avoid hot surfaces when operating the product! - Do not perform any task until the unit cools down or appropriate personal protection gear is worn. 4.1 Display Operation Introduction M70A_262 with 3 LEDs allow visual display of the inverter’s data and status as shown in Figure 4-1.
  • Page 49: Auto Id Commission Tool

    Commissioning 4.2 Auto ID Commission Tool The Auto ID function could set all inverter IDs at monitoring center after wiring RS-485. ATTENTION Please download the software from the following website: https://mydeltasolar.deltaww.com/dl_installer_guide.php?f=autoid 4.2.1 Auto ID Setting Open the software 1. Select COM Port and click 2.
  • Page 50 Commissioning The numbers of ID setting less than amounts of inverter, status show False. The numbers of ID setting more than amounts of inverter, status show False. Figure 4-3: False of auto ID setting by tool...
  • Page 51: Set Id

    Commissioning 4.2.2 Set ID To adjust the ID order, please follow the settings below. 1. Enter the ID you want to change . 2. Click to complete. Figure 4-4: Steps of set ID The wrong ID setting of overlapping. Figure 4-5: False of set ID...
  • Page 52: Set Country

    Commissioning 4.2.3 Set Country Set country by the AUTO ID. 1. Entry the local country ID number. 2. Click the to complete country setting. Figure 4-6: Steps of set country Enter as a country that does not exist. Figure 4-7: False of set country...
  • Page 53: Synchronize Time

    Commissioning 4.2.4 Synchronize time Synchronize time by Auto ID tool. Click the to complete time setting. Figure 4-8: Steps of synchronize time Interference problem make sync time fail, please try again. Figure 4-9: False of synchronize time...
  • Page 54: Delta Function Setting

    Commissioning 4.3 Delta Function Setting Delta offers two settings: DSS and APP (MyDeltaSolar) Please go to the following link to refer to the setting method manual. DSS: https://mydeltasolar.deltaww.com/manual/eng/SUB_1G/DSS.pdf APP (MyDeltaSolar): https://mydeltasolar.deltaww.com/?p=product_manual Data Collector > PPM DC1_100 Operation and Installation Manual...
  • Page 55: 5 Maintenance

    Maintenance 5 Maintenance Please check the unit regularly. If there are any impaired or loose parts, please contact your solar installer. Ensure that there are no fallen objects in the path of the heat outlet. WARNING ! - Prior to beginning any maintenance procedures outside AC breaker and DC switch off to avoid risk of electrical shock! 5.1 Open and Close the Door In order to guarantee proper long-term operation of the inverter, the following...
  • Page 56 Maintenance ① ② * Screw torque: M4 / 0.98 N•m ③ ⑤ ② ④ ① Figure 5-1: Opening and closing the door...
  • Page 57 Maintenance ATTENTION - After opening the door, please make sure the door is fixed by hexagon driver to avoid strong wind breaking it. Figure 5-2: To secure door by hexagon driver...
  • Page 58: Replacement Of Surge Protection Devices (Spd)

    Maintenance 5.2 Replacement of Surge Protection Devices (SPD) M70A_262 have the surge protection device (SPD) at both AC and DC side as shown in Figure 5-3. DC SPD AC SPD Figure 5-3: AC and DC SPD modules...
  • Page 59 Maintenance Surge protection devices (SPD) are designed to protect sensitive circuit elements of the inverter from damage caused by lightning and other electrical transients/surges, as such they are sacrificial components and periodically, may need replacement. The SPDs are located in the inverter. If a warning message “AC Surge”...
  • Page 60 Maintenance • Accessing the door 1. Switch DC and AC power off and wait until LED display turns off. 2. To access the door, use procedure found in Section 5.1.1 Do not leave the door opened for long periods of time. •...
  • Page 61 Maintenance DC SPD AC SPD * Screw torque: 0.8 N•m Please use manual pre-tighten before attaching. Figure 5-5: Steps of changing SPDs...
  • Page 62 Maintenance AC SPDs * A: Screw torque 2.45 N •m * G: Screw torque 0.8 N •m Figure 5-6: Remove wirings as connectors of AC SPD *Wi-Fi (option) DC SPDs * A: Screw torque 2.45 N • m * G: Screw torque 0.8 N • m Figure 5-7: Remove wirings as connectors of DC SPD...
  • Page 63: Smart Fans Replacement And Filter Cleaning

    Maintenance 5.3 Smart Fans Replacement and Filter Cleaning M70A_262 is provisioned with processor-controlled "smart fans" for cooling of the electronics. This section provides procedures for cleaning filters associated with these fans, and instructions for field replacement of the fans. The fans utilized have high reliability ratings and coupled with use of processor controls provide a "smart"...
  • Page 64 Periodic fan and filter cleaning is required to insure long life and reliability. - The time period between cleanings depends on the quality of the environment. - Under normal duty use, Delta recommends smart fans and filters be cleaned every 4 months - For very dusty locations, it may be necessary to clean the fans and filters quarterly or monthly.
  • Page 65: Power Module (Pm) Fan Tray

    Maintenance WARNING ! - Prior to beginning any maintenance procedures outside AC breaker and DC switch off to avoid risk of electrical shock! 5.3.1 Power Module (PM) Fan Tray The inverter electronics are convection cooled. The primary equipment used for this function consists of a fan tray located in a plenum within the inverter.
  • Page 66 Maintenance * Screw torque required for assembling: 0.98 N•m ① ② snap-fit ③ * Screw torque required for assembling: 0.6 N•m Figure 5-10: Disassembling fan tray from PM chassis...
  • Page 67: Internal Fan 1

    Maintenance 5.3.2 Internal Fan 1 Procedure to remove Internal Fan 1 (1) Remove the B cover. (2) Loosen two self-retaining screws shown in Figure 5-11 and remove the fan cabinet. (3) Disconnect the power connector on the DC SPD board. (4) Lift the entire fan assembly.
  • Page 68 Maintenance * Screw torque required for assembling: 0.8 N•m Figure 5-12: Take off the internal fan 1 * Screw torque required for assembling: 0.6 N•m Figure 5-13: Replace with a new fan...
  • Page 69: Internal Fan 2

    Maintenance 5.3.3 Internal Fan 2 Procedure to remove Internal Fan 2 (1) Loosen two self-retaining screws shown in Figure 5-14 and remove the fan cabinet. (2) Disconnect the power connector on the comm. board. (3) Lift the entire fan assembly. (shown in Figure 5-15) (4) Clean assembly or replace with a new fan.
  • Page 70 Maintenance * Screw torque required for assembling: 0.8 N•m Figure 5-15: Take off the internal fan 2 * Screw torque required for assembling: 0.6 N•m Figure 5-16: Replace with a new fan...
  • Page 71: Commissioning

    Maintenance 5.4 De-Commissioning When necessary to remove the inverter from active operation for maintenance or replacement, follow the instructions below. DANGER : ELECTRICAL HAZARD!! To avoid serious injury, please follow the procedure below. - Switch off external AC circuit breaker or switch to disconnect the electrical grid from the inverter chassis.
  • Page 72 Maintenance CAUTION : HOT SURFACES, DO NOT TOUCH ! - Use care not to touch hot surfaces if the inverter is just shutting down. - Do not perform any task until the product cool down sufficiently. CAUTION : POSSIBILE INJURY ! M70A_262 weighs more than 69 kg.
  • Page 73: 6 Error Message And Trouble Shooting

    Error Message and Trouble Shooting 6 Error Message and Trouble Shooting While Delta Electronics endeavors to build electronic products to very high standards of reliability, there will arise instances where the inverter may not operate properly. When such a condition is encountered, please follow the instructions in the Troubleshooting Guide (Tables 6-1, 6-2, and 6-3) to attempt to clear the fault.
  • Page 74: Fault Codes (Inverter Fault)

    Error Message and Trouble Shooting 6.2 Fault Codes (Inverter Fault) Table 6-2A: Fault Codes (inverter fault) & Messages Message Description Action Injection Contact customer service for Utility waveform is abnormal technical support (F01, F02, F03) Temperature One of inner ambient NTC and Check the installation ambient and High inverter module NTCs is over...
  • Page 75 Error Message and Trouble Shooting Table 6-2B: Fault Codes (inverter fault) & Messages Message Description Action Red COMM The internal communication Contact customer service for Fault connection is disconnected technical support (F22) DSP COMM The communication Fault Check the connection interface RS-485 connection is disconnected (F23) 1.
  • Page 76: Warning Codes (Field Warning)

    Error Message and Trouble Shooting 6.3 Warning Codes (Field Warning) Table 6-3A: Warning Codes (Field warning) & Messages Message Description Action DC Voltage Check the voltage connection to the Input voltage is under the limit inverter terminal (W01) 1. Check the installation ambient and environment 2.
  • Page 77: 7 Technical Information

    Technical Information 7 Technical Information Table 7-1A: Specifications Model M70A_262 DC Input Occasionally Max. voltage 1100 V * Operating Voltage Range 200 - 1000 V MPP Voltage Range (Full Power) 460 - 900 V * Start Voltage > 250 V Rated Voltage 600 V Max.
  • Page 78 Technical Information Table 7-1B: Specifications Model M70A_262 Efficiency Peak efficiency 98.8 % 98.4 % Euro efficiency Information Communication Port RS-485 / SUB_1G / Wi-Fi (optional) Regulation IEC 62109-1/-2 VDE-AR-N 4110 EN 61000-6-2 NB/T 32004: 2018 EN 61000-6-3 GB/T 19964: LVRT VDE-AR-N 4105 CNS 15382 VDE 0124-100...
  • Page 79 Technical Information Efficiency of M70A Output voltage at 400Vac Efficiency(%) Pn=70kW 100% 520V 600V 800V 100% Output Power (%) Figure 7-1: Efficiency Curve...
  • Page 80 Technical Information Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=1 P/Pn(%) Pn=70kW 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) Figure 7-2: Power Derating Curve with Ambient Temprature (PF=1)
  • Page 81 Technical Information Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=0.9 P/Pn(%) Pn=70kW 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) Figure 7-3: Power Derating Curve with Ambient Temprature (PF=0.9)
  • Page 82 Technical Information Apparent Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=0.9 S/Sn(%) Sn=70kVA 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) Figure 7-4: Apparent Power Derating Curve with Ambient Temprature (PF=0.9)
  • Page 83: Appendix: Assembly Note

    Technical Information Appendix: Assembly Note ③ ④ ⑤ ① ② ⑥ Appendix-1: Assembly Note-1 Location Screw torque Filter 10 kgf-cm (0.98N• m) Fan Tray 6 kgf-cm (0.6N•m) Antenna 12 kgf-cm (1.2N•m) Antenna Bracket (M4) 10 kgf-cm (0.98N•m) Grounded Bracket 250 kgf-cm (24.5N•m) Grounding (M6) 40 kgf-cm (3.9N•m)
  • Page 84 Technical Information ③ ① ② ④ ⑤ H4CFC4D-MS H4CMC4D-MS Appendix-2: Assembly Note-2 Location Screw torque Conductor cross-section Internal Fan 2 Cover 8.0 kgf-cm (0.8N•m) Internal Fan 2 Tray 6 kgf-cm (0.6N•m) Internal Fan 1 Cover 8.0 kgf-cm (0.8N•m) Internal Fan 1 Tray 6 kgf-cm (0.6N•...
  • Page 85 Technical Information ① ① ④ ⑤ ④ ⑥ ② ③ ③ ② ⑤ ④ Appendix-3: Assembly Note-3 NO Location Screw torque Conductor cross-section DC SPD board A: 25 kgf-cm (2.45N•m) G: 8.0 kgf-cm (0.8N •m) AC SPD board AC Cover 8.0 kgf-cm (0.8N•m) Toggle Latch 25 kgf-cm (2.45N•m)
  • Page 87 The power behind competitiveness 三相併網型變流器 M70A_262 操作手冊 English 繁體中文 www.deltaww.com...
  • Page 88 Contents ......... . 1 安全規範...
  • Page 89   4.3  Delta功能設定 ..........
  • Page 90 Figure ......... . 圖...
  • Page 91 ........圖 4-6: 國別設定步驟 .
  • Page 92 Table ......... 表...
  • Page 93: 1 安全規範

    安全規範 1 安全規範 1.1 變流器資料 1.1.1 免責聲明 著作權~ DELTA ELECTRONICS, INC. - All rights reserved. 本說明書及產品供終端使用者使用。技術資料及內圖文皆為機密資料且不經 DELTA ELECTRONICS, INC. 許可,禁止複製翻印。 維修工程師及終端使用者禁止洩漏內涵之訊息及除以正確使用本產品以外的目的 使用本說明書。所有資訊若有變更,不另外通知。 DELTA ELECTRONICS, INC.針對以下情形造成的損害將不負任何責任及義務: (a)產品沒有恰當的安裝或維修 (b)產品未依照說明書正確使用 (c)產品於拆裝過程受損 1.1.2 適用對象 本說明書適用於針對安裝、試運行、實際操作、後續維護受過良好訓練的人以下 基礎及進階技巧為必需的。 ‧ 了解基礎電力、配線、電子元件及電子電路符號 ‧ 了解太陽能變流器如何運行及操作 ‧ 針對電子產品的安裝及試運行受過訓練 ‧ 針對安裝及使用電子產品的過程中會遇到的危險及風險受過訓練 ‧ 遵守本說明書及所有安全規範...
  • Page 94: 安全概述

    重要安全指示:保存所有指示! - 請詳閱所有指示及保存供後續使用。 為了避免人員受傷或其他損失及確保變流器長期運轉,在使用此產品前請務必詳閱 所有安全指示。 本說明書針對DELTA併網型無變壓器太陽能變流器提供重要指示。本產品進行設計、 測試、驗證且經國際安全規範認證,但安裝及使用本產品前仍須做好防範措施。 本產品適用於室內及戶外。 注意:無電氣隔離 - 本產品需安裝外部隔離變壓器確保交流側與光伏模組進行隔離。 - 本產品無附加變壓器, 為非電氣隔離型。 市電端與變流器間需加入外部變壓器。 請勿使用需接地(正極或負極)之太陽能板。 若使用了, 則本產品會以INSULATION (E34) 告警。 - L1, L2, L3,及 N 禁止連接至地。 1.2.1 使用條件 - M70A_262為 6 MPP追蹤、無變壓器太陽能變流器,能將太陽能串列的變動電流 轉換成與市電頻率相同之三相交流能量並饋入市電。 - 所使用之太陽能模組需與變流器匹配。 - 太陽能面板之對地電容不可超過 10μF。 - 本產品僅可在經DELTA及市電業者許可之國家運行。...
  • Page 95 安全規範 1.2.2 標誌 本節說明本說明書會出現的標誌定義,為了避免人員受傷或其他損失及確保變流器 長期運轉,在使用此產品前請務必詳閱所有安全指示並遵守。 危險! - 此警語表示可能發生致死或嚴重傷亡的情形。 警告! - 此警語表示可能發生致死或嚴重傷亡的情形。 注意! - 此警語表示可能發生較輕微傷害的情形。 注意 - 此警語表示可能對資產或環境造成傷害。...
  • Page 96 安全規範 資訊 - 進一步的資訊會經由雙圈驚嘆號指示。 這代表接續的內容將含有使用者該遵守的重要資訊以免造成任何傷害。 危險:觸電!! - 此警語表示可能會有造成嚴重傷亡的觸電可能。 注意:表面高溫,請勿觸碰! - 此警語表示當變流器運行時機體表面高溫, 待表面溫度下降後在進行需接觸的工作。 - 等待圖示中所顯示的時間後再進行工作 - 設備接地導體...
  • Page 97: 2 產品介紹

    產品介紹 2 產品介紹 M70A_262 以最先進之高頻切換及低EMI技術設計而成,同時具有高效率及高壽 命的特點,亦適用於戶外。 注意:無電氣隔離 - 本產品無附加變壓器,為非電氣隔離型。 請勿使用需接地(正極或負極)之太陽能板。 若使用了,則本產品會以INSULATION (E34) 告警。 - L1, L2, L3,及 N禁止連接至地。 2.1 適用機種 本說明書適用以下機種: • M70A_262 安裝、運行及維護過程皆必須遵守本說明書。 DELTA保留在不另行告知的前提下修改內容及技術資料的權力。...
  • Page 98: 產品概述

    ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨ ⑩ 圖2-1 : 內容物 表2-1 : 內容清單 M70A_262 物件 數量 描述 DELTA太陽能變流器 太陽能變流器 將變流器掛起之壁掛架 壁掛架 (材質: 鋁 / 厚度: 3mm) 安裝及維運過程中務必參考本說明書中 說明書 的安全指示 SUB_1G 天線 SUB_1G專用天線 六角板手 固定前蓋用門閂與卸除鎖扣外蓋螺絲工具 (已安裝於鎖扣外蓋上) 保護架 直流組串接頭保護架 H4端子...
  • Page 99: 圖 2-2: 外觀介紹

    產品介紹 外部風扇 天線支架 SUB_1G 天線 Wi-Fi 模組輸入 直流開關 RS-485 鎖扣外蓋 交流輸出 Wi-Fi 天線 直流輸入 (H4) (選配) x 12 strings 圖 2-2 : 外觀介紹...
  • Page 100: 表 2-2: 標籤內容描述

    Protective Class (防護等級/防护等级) Over Voltage Category : AC:III / DC:II (過電壓等級/过电压等级) Made in China Authorized representative VDE-AR-N 4105 Delta Electronics (Netherlands) B.V. Zandsteen 15, 2132 MZ Hoofddorp, VDE-AR-N 4110 The Netherlands IP65 60 seconds 圖2-3 : 標籤 表2-2 : 標籤內容描述...
  • Page 101: 圖 2-4: 外部/ 內部 結構

    產品介紹 圖 2-4 : 外部/ 內部 結構...
  • Page 102: 圖 2-5: 配線箱架構圖

    產品介紹 ⑭ ⑬ ⑮ ⑦ ⑫ ⑪ ④ ⑨ ⑩ ⑥ ① ③ ⑤ ② ⑧ 圖2-5 : 配線箱架構圖 表2-3 : 配線箱架構圖內容描述 Component Component Component 2.8” cable opening for AC Communication port Outter fan AC terminal Type II DC SPD Wi-Fi (option) H4 connectors Type II AC SPD...
  • Page 103: 3 安裝

    安裝 3 安裝 注意! - 本產品不建議安裝在直接日照曝曬處。 警告! - 請勿將本產品安裝在易燃表面附近。 - 請將本產品安裝於堅固且平順之表面。 本章節包含以下指示 1.機構安裝 2.電氣安裝 3.通訊安裝...
  • Page 104: 拆箱與檢視

    安裝 3.1 拆箱與檢視 請依照圖 3-1所示拆封外箱包裝。 建議兩人以上進行作業(圖 3-2)。 針對站立式安裝, 建議腳架於開箱步 驟時進行安裝,請 建議兩人以上進行 參考3.2.2章節。 扶正作業。 圖 3-1: 開箱步驟...
  • Page 105: 圖 3-2: 搬動施力位置

    安裝 搬動時,請勿施加 搬動時,請勿施加 搬動時,請勿施加 外力於風扇出風口 外力於DC側端子頭 外力於DC旋鈕 搬動時,請勿施加 外力於AC防水塞頭 圖 3-2: 搬動施力位置...
  • Page 106: 機構安裝

    安裝 3.2 機構安裝 此機器設計支援壁掛式安裝,請參考3.2.1 章節;同時亦支援落地式安裝(選配), 請參考3.2.2章節。 3.2.1 直立壁掛式安裝 請參考圖3-4至3-9說明 1. 請先確定產品安裝牆面為足以承載產品重量。 2. 水平固定壁掛架(垂直於地板),壁掛架尺寸如圖3-4所示。 3. 鎖附12枚M6十字螺絲於壁掛架上。(圖3-5) 4. 將產品放置於壁掛架上。 5. 將產品鎖附上2枚M6十字螺絲於圖3-5所示之位置。 此處亦為設備外部接地點,設備接地方式請參閱3.5.2章。 注意! - 至少使用8枚M6螺絲將壁掛架固定牆上。 - 該壁掛架為本產品專用,請勿使用其他壁掛架來搭配本產品使用。 - 未遵守以下安裝說明中的方向和間隙可能導致降額功率輸出並可能使保固失效。...
  • Page 107: 圖 3-3: 變流器尺寸

    安裝 699 mm 264 mm 圖 3-3: 變流器尺寸 單位: mm 圖 3-4: 壁掛架尺寸...
  • Page 108: 圖 3-5: 壁掛螺絲鎖附位置

    安裝 壁掛建議螺絲鎖附孔位置(至少8枚螺絲) 圖 3-5 : 壁掛螺絲鎖附位置 >200mm 圖 3-6: 正確的安裝位置...
  • Page 109: 圖 3-7: 禁止的安裝方式

    安裝 圖 3-7: 禁止的安裝方式 Wall > 990mm > 24cm > 41.5cm > 84cm > 700mm Inverter #1 Inverter #2 > 100cm > 400 > 40.8cm > 47cm > 690mm* * 移除前蓋進行配線作業時 (移除前蓋步驟請參閱3.3章) 圖 3-8: 壁掛所需間距...
  • Page 110: 圖 3-9: 機台間最低要求距離

    安裝 牆面 未安裝隔板 >200mm >200mm >300mm >600mm >300mm >60mm * >60mm * * 如果安裝位置有浸水風險或處於積雪區域,請提高變流器的安裝高度。 安裝隔板 隔板 建議尺寸 200mm >830mm >150 >150 >380mm 背對背安裝 > 50mm 200mm 採背對背安裝時, 須於左右兩側加裝隔板。 圖 3-9: 機台間最低要求距離...
  • Page 111: 落地式安裝(選配

    安裝 3.2.2 落地式安裝(選配) 如果採用落地式安裝,請購買落地支架配件。 1.確保安裝設備的地面基座強度足夠且足以承載重量。 2.水平安裝落地支架(垂直於地板),並標記所需安裝孔位置如圖3-11所示。 3.用4個螺絲將落地支架固定到機器腳座上(圖3-10)。 4.使用4個M12螺絲將落地支架固定在機器腳座上(圖3-11)。 5.將變流器安裝在地面安裝基座上。 * 螺絲扭矩值: 24.5 N•m 圖 3-10: 落地支架安裝...
  • Page 112: 圖 3-11: 將變流器安裝在地面安裝基座上

    安裝 Φ15 mm 310 mm 458 mm 高度 * * 如果安裝位置有浸水風險或處於積雪區域, 請使用適當的基座墊高變流器的高度。 圖 3-11: 將變流器安裝在地面安裝基座上...
  • Page 113: 交流配線安裝

    安裝 3.3 前蓋 為了確保變流器可以良好的長期運轉,開關前蓋時,請務必參考5.1章節步驟。 當安裝空間狹窄不易進行配線作業時,請依圖3-12所示拆除前蓋。配線完成後, 請將前蓋安裝回變流器,並按照5.1.2章節的步驟關閉前蓋。 圖3-12 : 拆除前蓋 3.4 交流配線安裝 危險:觸電危險!! - 配線時禁止供給變流器任何電源。 警告! - 遵守條文為安裝者的責任。 注意:變流器及設備可能損毀! - AC端子安裝須遵守當地電氣法規。 - 不遵守指示可能會損壞交流線材。 注意:錯誤的交流線材! - 為了不損壞變流器中的組件,請確保將正確的線材連接到變流器上相應的交流端子。...
  • Page 114: Ac 形式與連接方式

    安裝 3.4.1 AC 形式與連接方式 注意 機器初始設定為 3Ø-3W接線方式,也可變更為 3Ø-4W 含中性點N的接線 方式。變流器可工作於下述電力系統連接方式無須額外配接外部變壓器。 TNC system TNC-S system 230/400V 230/400V PE/N M70A M70A TNS system TT system IT system 230/400V 230/400V 230/400V M70A M70A M70A 3.4.2 必要保護裝置 建議於市電端與變流器間加入斷路器做為過電流保護。 型號 斷路器規格 M70A_262 150A max. 3.4.3 交流配線安裝 請遵循以下步驟組裝交流端子:...
  • Page 115 安裝 M70A_262 適用銅絞線,銅軟線,鋁絞線,鋁實心(含扇形) 銅絞線 銅軟線 鋁絞線 鋁實心 (需壓接端子) (扇形) * • 銅線: 銅軟線需壓接端子,其他銅線型直接裸線鎖附即可。 • 鋁線: 鋁線連接端子時必須去除末端的氧化層。(需注意刮下的鋁粉墨 勿沉積其他導體上) 去除氧化層後,建議立即使用中性脂或無酸,無鹼凡士林塗 在導體的末端,並立即連接導線。 當導線重新連接時,需再次處理氧化層。 * 扇形線接線方向如右圖所示 警告! - 如果沒有遵循以上預處理,接觸電阻將會顯著增加,可能會導致溫升過高, 甚至導致著火。...
  • Page 116: 交流側- 配線前準備

    安裝 圖 3-13 : 多層式防水塞蓋 表 3-1: 電纜線尺寸對照表 卡線線徑範圍 (mm) 扭力 (N•m) 距離 P (mm) 51-57 2550 mm 43-50 1962 mm 36-43 1450 mm 30-36 1017 mm 26-30 706 mm 3.4.4 交流側- 配線前準備 在進行導線與端子座安裝連接之前,請遵循以下步驟。 對於每個交流端子(L1,L2,L3,N): 請用17mm六角板手進行拆裝螺絲。如果使用電動工具進行施工,請確保使用適 當扭力值,避免超過或不足擰緊螺絲的扭力值。當鎖附螺絲頂到最低點時,請勿 再進行鎖附,避免造成端子座損傷。 注意: 有可能產生高溫: 若壓接點的阻抗過高,該點則有可能產生高溫導致火災。...
  • Page 117: 交流配線

    安裝 3.4.5 交流配線 有關用於連接交流端子的交流導線準備步驟,請參閱第3.4節中的圖3-12。 確保所使用的交流導體尺寸符合NEC或當地電力法規的規範,參閱圖3-12。 After inserting conductor, torque terminal nut by 31 N • m (PE: 14.7 N • m) Bottom AC entry AC terminal Up to 2.8 "trade size gland 圖 3-14: 交流端子位置圖 圖3-14為交流導管安裝處和連接機器內部交流端子的位置圖: - 如第3.4.4節所述,卸下所有交流端子上的六角螺絲。 - 確保將正確的導線連接到相應的端子位置。 - 插入導線後,使用8 mm六角扳手鎖緊L1,L2,L3,N端子,安裝鎖附扭力值...
  • Page 118: 直流配線安裝

    安裝 3.5 直流配線安裝 危險:觸電危險!! - 太陽能串列將太陽能轉換成高壓直流形式,此高壓有可能造成觸電危險。 - 配線前請使用非透明物質將太陽能串列遮蓋起來。 - 配線時請確認電壓極性 警告! - 觸電及火災危險。僅允許使用有標示低於1100V的太陽能串列。 - 配線時請確認直流開關在"關"的模式,且太陽能陣列沒有連接。 注意:DC開關! - 為了不損壞變流器內部元件,請勿頻繁且快速地切換直流開關,正確的操作方式為 等待LED顯示"綠燈滅及黃燈閃爍"(無直流) 或等待5分鐘之後。 注意 - 太陽能陣列的正或負端皆禁止接到地。 - 根據UTE法規,建議配置斷路器於太陽能陣列與變流器之間做為過電流保護裝置。 危險:觸電危險!! - 在安裝直流端子時,請務必確認端子極性是否正確,錯誤的極性,將可能導致 變 流 器 造成損壞。 注意 - 未使用的DC串列輸入端子,請勿移除防水塞。...
  • Page 119: 直流接線安裝

    安裝 3.5.1 直流接線安裝 連接時請遵循以下步驟 : • 請使用材質為銅的導線,並確認尺寸符合NEC或當地法規。 • 剝除6.5-7.5mm的電線外皮。 • 每根直流導線的橫截面積為12/10 AWG (4/6mm )。 直流端導線分為正負極配接,其配線方式如圖3-16所示。 • 安裝直流接線後,插入直流接頭專用的保護支撐架,方法如圖3-17所示。 M70A_262 使用H4端子連接到變流器。 外部配線用端子附於配件包中(見圖3-15)。 H4CFC4D-MS H4CMC4D-MS 圖 3-15: 直流接線安裝...
  • Page 120: 圖 3-16: 端子與光伏組串對照圖

    安裝 SWITCH 1 SWITCH 2 圖 3-16 : H4 端子與光伏組串對照圖...
  • Page 121: 圖 3-17: 保護架安裝說明

    安裝 PUSH PUSH 為了有效支撐直流組串接頭, 保護架應位於端子下方。 圖 3-17 : 保護架安裝說明...
  • Page 122: 設備接地

    安裝 3.5.2 設備接地 將接地線壓接O型端子後,鎖附於機殼外部接地點。 機殼外部接地點位置如圖3-18所示。 螺絲扭矩值: M6/ 3.9 N•m 圖 3-18 : 設備接地點...
  • Page 123: 圖 3-19: 天線安裝

    安裝 3.6 天線 本機器支援SUB_1G無線通訊,使用前須採用1.2 N‧m安裝專用天線。 安裝注意事項如圖3-20所示。 請安裝天線支架如圖3-21所示。 注意 - 不使用天線時,請將防水螺母外蓋及天線支架的三顆M4螺絲鎖上。 - 安裝天線後,請妥善保存防水螺母外蓋。 - 防水螺母外蓋遺失時,請與DELTA聯繫。 安裝位置 安裝天線後,請妥善 收納防水螺母外蓋。 13mm Open end wrench 卸下防水螺母外蓋。 請使用1.2N‧m的扭力安裝天線。 圖 3-19 : 天線安裝...
  • Page 124: 圖 3-20: 安裝天線的注意事項

    安裝 >20cm 為保持良好通訊品質,請確保天線 周圍20cm無遮蔽物 天線保持向上 圖 3-20 : 安裝天線的注意事項...
  • Page 125: 圖 3-21: 安裝天線支架

    安裝 1. 逆時針旋轉天線約45度。 2. 裝上天線支架。 3. 將天線轉回適當位置(天線保持向上)。 4. 使用圖3-21 鎖緊三顆螺絲。 扭矩值 ① ② ③ ④ Screw locations * 螺絲扭矩值: M4 / 0.98 N • m 圖 3-21 : 安裝天線支架 注意 - 當配合DELTA PPM DC1 使用時,請參閱PPM DC1 使用說明書 _100 _100 https://mydeltasolar.deltaww.com/?p=product_manual...
  • Page 126: 通信模組配接方式

    安裝 3.7 通信模組配接方式 通信模組如圖3-22所示。 該模組提供一組12V電壓源VCC、RS-485、乾接點,EPO和數位輸入端子供功 率控制使用;詳細說明如下。 使用VCC 與GND輸出腳位,可提供一12VDC電源,可供外部裝置使用。 VCC *1 & EPO *1 Digital Inputs *6 VCC & RS-485 Dry Contact * 2 圖 3-22 : 通信模組...
  • Page 127: 圖 3-23: 通信模組位置圖

    安裝 請參考5.1章節說明開啟前蓋,通信模組安裝於圖3-23中紅圈處位置。 圖3-23 : 通信模組位置圖...
  • Page 128: 表 3-2: Rs-485 端子座說明

    安裝 3.7.1 RS-485 連線 RS-485端子座腳位定義如表3-2所示 -腳位1與2提供直流電壓12V/0.5A電源 -腳位3與5 為RS-485差動信號之DATA+信號專用腳位 -腳位4與6 為RS-485差動信號之DATA-信號專用腳位 依據上述的腳位,可以實現多台變流器的通信連接。 本機器設有120歐姆終端電阻,可使用通信模組上的控制開關 進行切換(見圖3-24)開關切換方式如表3-3所示。 不同的RS-485連接方式時,需使用不同的終端電阻設定方式。 • 當多台變流器連接時,只有最後一台變流器必須將終端電阻接通如圖3-24。 • 如果RS-485總線長度大於610m,建議使用Belden 3105A電纜或同規品來確 保通信品質。 注意 - 為確保良好的通信品質,建議使用絞線之電纜方式配置。 表 3-2: RS-485 端子座說明 Function 1 2 3 4 5 6 VCC (+12V) DATA+ DATA- DATA+ VCC GND D+ DATA- 資訊...
  • Page 129: 圖 3-24: 多台併接通訊示意圖

    安裝 Terminal Resistor 120Ω(1/2W) DATA+ to DATA- RS485/USB RS485/RS232 圖 3-24 : 多台併接通訊示意圖 Termination switch 表 3-3 : 終端電阻設定說明 Switch 1 Terminal Resistor ON Terminal Resistor OFF...
  • Page 130: Epo 緊急關斷功能與數位輸入

    安裝 3.7.2 EPO 緊急關斷功能與數位輸入 本通信模組提供緊急關斷功能(EPO)。 可使用APP或Delta Solar System (DSS)進行設定。 VCC K0 K1 K2 K3 K4 K5 K6 圖 3-25 : 緊急關斷功能端子座 利用VCC和K0連接,可啟用EPO功能。此外,還可以利用數位輸入功能,進行 功率降低控制,限制變頻器的有效輸出功率。此控制設置可依據表3-4 所示的 方式,將對應的兩個腳位進行短路來實現。 表 3-4: 數位輸入與EPO功能說明 短路腳位 變流器動作反應 VCC & K0 緊急關斷 (EPO) VCC & K1 控制至0 % 額定功率...
  • Page 131: 乾接點連接說明

    安裝 3.7.3 乾接點連接說明 M70A_262 提供兩組乾接點端子,可依據變流器運行狀態控制外部裝置。該功能 的接線端子如圖3-26所示,圖中標示為兩組乾接點端子位置,乾接點為常開狀態, 其動作方式定義,使用者可藉由APP或DSS進行設定。 Dry Contact B Dry Contact A 圖 3-26 : 乾接點連接位置圖...
  • Page 132: 裝置場所之絕緣測試

    安裝 3.8 裝置場所之絕緣測試 針對客戶想要於太陽能案場進行絕緣測試時,請依循下列步驟: 1. 確認直流開關於OFF的狀態 2. 請確認高阻計對變流器以及對地的接法正確如圖3-27,若是不正確的接線可能 會導致變流器的損壞 DC Switch SWITCH 1 SWITCH 2 SWITCH 1 SWITCH 2 Hi-pot / Insulation 圖 3-27 : 絕緣測試之危險預防...
  • Page 133: 4 試運行

    試運行 4 試運行 注意:表面高溫,請勿觸碰! - 當開蓋時請小心表面高溫。 - 表面冷卻前請勿接觸變流器。 4.1 控制面板介紹 M70A_262 提供3顆LED燈號顯示變流器狀態,如圖4-1所示。 LED燈狀態對應表,請參考表 4-1 所示,可利用該表獲得變流器運行狀態資訊。 LED Indicator LED Indicator LED Indicator (GRN) (RED/YEL) (GRN) 圖 4-1 : 顯示面板 表 4-1: LED 指示燈 狀況 Grid (綠) Alarm (紅/黃) Countdown FLASH On Grid Inverter Fault / Remote off ON / OFF Inverter Warning...
  • Page 134: 自動Id連線工具使用說明

    試運行 4.2 自動ID連線工具使用說明 當機器完成RS-485 連接後,可利用自動ID連線工具進行全部變流器的ID設定。 注意 請至下方網址進行軟體下載 https://mydeltasolar.deltaww.com/dl_installer_guide.php?f=autoid 4.2.1 自動ID 設定 開始軟體 1. 選擇 COM Port 並點 2. 輸入變流器數量並點 3. 出現變流器編號及 ID,並顯示 OK 即完成。 圖 4-2 : 自動ID設定步驟...
  • Page 135: 圖 4-3: 自動Id 設定無效說明

    試運行 當輸入的ID設置數量少於變流器數量時,狀態將顯示錯誤。 當輸入的ID設置數量大於變流器數量時,狀態將顯示錯誤。 圖 4-3 : 自動ID 設定無效說明...
  • Page 136: Id設定

    試運行 4.2.2 ID設定 當需要調整ID順序時,請依下述說明進行設定 1. 輸入欲調整的ID。 2. 點選 即完成。 圖 4-4 : 設定ID 步驟 重複設置ID 圖 4-5 : ID設定錯誤範例...
  • Page 137: 國別設定

    試運行 4.2.3 國別設定 藉由Country ID 設定國別 1. 輸入所在國別ID。 2. 點選 即完成設定。 圖 4-6 : 國別設定步驟 輸入不存在的國別ID。 圖 4-7: 國別設定錯誤範例...
  • Page 138: 時間同步設定

    試運行 4.2.4 時間同步設定 藉由自動ID工具進行時間同步。 點選 即完成同步設定 圖 4-8 : 時間同步設定步驟 同步動作可能因為干擾導致失敗,請再試一次。 圖 4-9 : 時間同步設定錯誤範例...
  • Page 139: Delta功能設定

    試運行 4.3 Delta功能設定 Delta 提供兩種機器設定方式 : DSS 與APP (MyDeltasSolar) 請使用下面連結取得使用說明 DSS: https://mydeltasolar.deltaww.com/manual/eng/SUB_1G/DSS.pdf APP (MyDeltaSolar): https://mydeltasolar.deltaww.com/?p=product_manual Data Collector > PPM DC1_100 Operation and Installation Manual...
  • Page 140: 5 維護

    維護 5 維護 為確保變流器正常運轉,請至少每半年確認一次變流器所有端子與螺絲是否鬆脫、電纜線 是否毀損、散熱出風口有無異物阻塞。如有上述情形,請聯絡合格之技術人員進行維修、 清理或更換。 警告 ! - 進行任何維修動作前,請確定交直流電源皆已切斷以避免觸電危險。 5.1 開啟與關閉前蓋 為確保變流器正常運行,開啟或關閉前蓋時,請遵守圖5-1步驟。開啟前蓋後, 請依照圖5-2方式,將前蓋固定。 5.1.1 開啟前蓋 • 在沒有任何雨遮的情況下,切勿在陰雨天氣下打開前蓋,以保護變流器。 • 關閉直流與交流電源並等待LED指示燈熄滅。 • 鬆開天線支架上的三個螺絲。 • 逆時針旋轉天線與支架約45度。 • 取出鎖扣外蓋上的板手。 • 鬆開鎖扣外蓋上的一個螺絲並打開鎖扣外蓋。 • 注意不要污染前蓋上的墊圈和接合表面。 請勿長時間開啟前蓋。 5.1.2 關閉前蓋 關閉前蓋之前注意事項: 1.確認前蓋門框表面與前蓋防水墊圈清潔,必要時請先擦拭。 2.確認墊圈在其安裝槽中且定位正確並對齊。 當關閉前蓋時: 1. 反序按照5.1.1的步驟,並鎖定鎖扣外蓋。 2. 將鎖扣外蓋螺絲完全鎖緊至2.45 N‧m的扭矩。...
  • Page 141: 圖 5-1: 開啟與關閉前蓋

    維護 ① ② * 螺絲扭矩值: M4 / 0.98 N•m ③ ⑤ ② ④ ① 圖 5-1 : 開啟與關閉前蓋...
  • Page 142: 圖 5-2: 利用板手將前蓋進行固定

    維護 注意 - 開啟前蓋後,請利用板手將前蓋進行固定,避免因為強風導致前蓋搖晃。 圖 5-2 : 利用板手將前蓋進行固定...
  • Page 143: 更換雷擊保護裝置 (Spd)

    維護 5.2 更換雷擊保護裝置 (SPD) 交流與直流側的雷擊保護裝置(SPD),如圖5-3所示。 直流側 交流側 圖 5-3 : 交流與直流側的雷擊保護裝置...
  • Page 144: 圖 5-4: Spd故障時的面板顯示

    維護 雷擊保護裝置是為了保護較為敏感的電路元件,避免當其受到雷擊或電壓驟變時 損壞。 雷擊保護電路位於變流器內部,當APP或DSS 故障訊息出現 " AC Surge" 或 "DC Surge" 時,請按照下頁順序進行更換。 請參考圖5-4 所示,依據LED燈號進一步判斷SPD 損壞與否。 LED Indicator (RED FLASH) LED Indicator LED Indicator (GRN ON) (GRN ON) 圖 5-4 : SPD故障時的面板顯示...
  • Page 145 維護 • 開啟前蓋步驟 1. 將直流與交流電源關閉,並等待LED 燈號熄滅。 2. 遵照5.1.1章節順序開啟前蓋,施工時請勿長時間開啟前蓋。 • 依據以下順序更換SPD模組: 交流與直流雷擊保護器位置如圖5-5 所示。 • 更換異常的AC SPD模組 (圖 5-6) 1. 旋鬆A蓋板上的4顆具防脫落功能的螺絲。(螺絲扭矩值: 0.8 N•m) 2. 從AC SPD電路板上拆下2條信號排線。(4pinx1 ,2pinx1) 3. 拆下AC SPD電路板連接到AC端子的4顆防脫落螺絲。 4. 拆下電路板右側和左側的2顆防脫落螺絲。 5. 取下異常AC SPD電路板並更換新模組。 6. 按反順序使用上述步驟安裝新的AC SPD。 將6個螺絲鎖緊至扭矩值如圖5-6所示。 • 更換異常的DC SPD模組 (圖...
  • Page 146: 圖 5-5: Spd更換步驟

    維護 DC SPD AC SPD * 螺絲扭矩值: 0.8 N•m 鎖附前,請先使用手動預鎖。 圖 5-5 : SPD更換步驟...
  • Page 147: 圖 5-6: 移除Ac Spd 螺絲與排線

    維護 AC SPDs * A: Screw torque 2.45 N •m * G: Screw torque 0.8 N • m 圖 5-6 : 移除AC SPD 螺絲與排線 *Wi-Fi (option) DC SPDs * A: Screw torque 2.45 N •m * G: Screw torque 0.8 N • m 圖...
  • Page 148: 智慧風扇更換與濾網清潔

    維護 5.3 智慧風扇更換與濾網清潔 M70A_262 提供具可控型的智慧風扇冷卻變流器系統,此章節中說明濾網清潔與 組裝,以及在案場中更換風扇得方式說明。 此風扇模組具有高可靠度,並且結合控制器提供一個"智能化"的長效型冷卻系統。 當控制器偵測到風扇系統異常時,會產生"FAN-FAIL" 的故障警報,此時變流器會 在安全的運作範圍內進行降載運作。 依據功能性不同,變流器所使用的風扇安裝於兩個位置: • 功率模組部位 • 變流器內部位置 圖 5-9, 5-10 為功率模組風扇位置。 圖 5-11, 5-12, 5-13 為內部風扇1的位置。 圖 5-14, 5-15, 5-16 為內部風扇2的位置。...
  • Page 149: 圖 5-9: 功率模組之智能型風扇位置

    維護 Air Outlets / Smart Fans inside PM Filter 圖 5-9 : 功率模組之智能型風扇位置 注意 需要定期的將風扇和過濾器清潔,以確保長壽命和可靠性。 - 風扇及濾網清潔頻率由當地環境決定。 - 正常環境條件使用下,每四個月需清潔風扇及濾網一次。 - 若安裝於嚴苛環境,建議每個月或每一季需清潔風扇及濾網一次。 因該冷卻系統採用模組化設計,因此具有易清潔與易維護更換的特性。...
  • Page 150: 功率模組專用風扇

    維護 警告 ! - 在開始任何維護程序之前,請將交流斷路器和直流開關關閉以避免電擊危險! 5.4.1 功率模組專用風扇 變流器電子設備主要是利用對流進行冷卻。 而主要的功率元件則必須利用變流器後方的風扇組進行散熱,藉由隔離的配置將 熱量透過散熱鰭片通過空氣流動達到散熱的功能。 功率模組使用的風扇組,採用風扇架將四顆風扇進行模組化,同時可進行全速運轉 亦可進行轉速調節;當變流器在額定輸出且高溫狀態,風扇將以全速運轉,當風扇 故障時,變流器發電狀態則進入降載模式運行。同時在風扇組的入風與出風口處, 均有濾網進行保護。 請參閱圖5-10並按照下面列出的步驟操作: 1. 卸下入風口過濾網外蓋的四顆螺絲。 此步驟進行後,同時確認過濾網狀態,必要時進行清潔。 進行風扇維護時,請繼續執行以下步驟。 2. 取下每個風扇電源排線。(要釋放卡扣,請從兩側按位置A和位置B。) 3. 從機箱中取出風扇托盤。 要單獨拆卸風扇時,請卸下其固定到風扇托架的四顆螺釘。 重新安裝風扇架時,請按照上述步驟的順序重新組裝並鎖緊螺絲。 扭矩值如圖5-10所示。...
  • Page 151: 圖 5-10: 風扇架拆卸示意圖

    維護 * 螺絲扭矩值: 0.98 N•m ① ② snap-fit ③ * 螺絲扭矩值: 0.6 N•m 圖 5-10 : 風扇架拆卸示意圖...
  • Page 152: 內部風扇1

    維護 5.4.2 內部風扇1 拆裝內部風扇1步驟 (1) 拆下B蓋。 (2) 鬆開圖5-11中所示的兩顆防脫落螺絲,然後拆下風扇架。 (3) 取下DC SPD板上的電源連接排線。 (4) 取下風扇組件。(如圖5-12所示) (5) 清潔風扇組件或更換新風扇。(如圖5-13所示) (6) 使用0.8N‧m的扭矩重新組裝。 Fan connector * 螺絲扭矩值: 0.8 N•m 圖 5-11 : 內部風扇1 位置與拆裝示意圖...
  • Page 153: 圖 5-12: 取下內部風扇1示意圖

    維護 * 螺絲扭矩值: 0.8 N•m 圖 5-12 : 取下內部風扇1示意圖 * 螺絲扭矩值: 0.6 N•m 圖 5-13 : 更換風扇示意圖...
  • Page 154: 內部風扇2

    維護 5.4.3 內部風扇2 拆裝內部風扇2步驟 (1) 鬆開圖5-14中所示的兩顆防脫落螺絲,然後拆下風扇架。 (2) 取下通訊板上的電源連接排線。 (3) 取下風扇組件。(如圖5-15所示) (4) 清潔風扇組件或更換新風扇。(如圖5-16所示) (5) 使用0.8 N‧m的扭矩重新組裝。 Fan connector * 螺絲扭矩值: 0.8 N•m 圖 5-14 : 內部風扇2 位置與拆裝示意圖...
  • Page 155: 圖 5-15: 取下內部風扇2示意圖

    維護 * 螺絲扭矩值: 0.8 N•m 圖 5-15 : 取下內部風扇2示意圖 * 螺絲扭矩值: 0.6 N•m 圖 5-16 : 更換風扇示意圖...
  • Page 156: 終止運轉

    維護 5.5 終止運轉 當機器需要停止運轉進行維護或保存時,請依照下面指示進行。 危險:觸電危險!! - 為避免嚴重傷亡,請依照下列步驟進行。 - 關斷外部AC斷路器或開關確認與市電解離。 - 關閉兩組DC開關。 - 使用H4端子專用工具移除光伏模組之直流輸入H4端子,由於移除作業時,不 可處於帶電狀態,因此務必確認直流開關必須為OFF,且無直流電流狀態。 ■ RS-485 Communication module 1.切離與通訊板連接的所有通訊線路。 2.從通訊板組件上拆下接線。...
  • Page 157 維護 注意: 表面高溫 請勿觸碰 ! - 變流器剛中斷時,請注意表面高溫。 - 直到表面降至適當溫度前,請勿碰觸變流器。 注意: 可能造成傷害 ! - M70A_262重達 69 公斤以上。 - 若在搬運或從壁掛架拆卸過程中意外掉落可能造成傷害。 - 操作人員應配戴手套並穩固變流器底座以防止受傷。 注意 - 螺絲螺帽移除後請留意,切勿將他們遺漏於機器內。...
  • Page 158: 6 錯誤告警及排除問題

    錯誤告警及排除問題 6 錯誤告警及排除問題 台達致力於打造高可靠標準的電子產品,若出現變流器無法正常動作的情況時, 請使用故障排除指南 (表6-1,6-2和6-3) 中的說明,進行故障排除;若經過排除 後仍無法解決問題,請聯繫客服中心尋求技術協助。 6.1 錯誤訊息(配置端故障) 表 6-1A: 錯誤訊息 (配置端故障) 資訊顯示 可能原因 故障排除 AC Freq 1. 請檢查變流器端的市電頻率 High 市電頻率過高 2. 請檢查國家設定 (E01) AC Freq 1. 請檢查變流器端的市電頻率 市電頻率過低 2. 請檢查國家與電網設定 (E02) Grid Quality 在電網或靠近變流器附近非線性的 當重複發生時,請聯繫客服人員,尋求技術支援 (E07) 負載 AC phase abnormal 在AC介面連接錯誤...
  • Page 159: 故障訊息(變流器故障)

    錯誤告警及排除問題 6.2 故障訊息(變流器故障) 表 6-2A: 錯誤訊息 (變流器故障) 資訊顯示 可能原因 故障排除 Injection 市電波形異常 請聯繫客服人員,尋求技術支援 (F01, F02, F03) Temperature 變流器內部環溫或功率模組 High 請檢查設備的周遭和環境 溫度過高 (F05) Temperature 變流器內部環溫或功率模組 請檢查設備的周遭和環境 溫度過低 (F07) Amb Temp Fault 環境溫度>90℃或<-30℃ 請聯繫客服人員,尋求技術支援 (F06) Inveter Temp Fault 變流器溫度>98℃或<-30℃ 請聯繫客服人員,尋求技術支援 (F10) AC Sensor 1.
  • Page 160: 表 6-2B: 故障訊息(變流器故障)

    錯誤告警及排除問題 表 6-2B: 錯誤訊息 (變流器故障) 資訊顯示 可能原因 故障排除 Red COMM Fault 變流器內部通訊異常 請聯繫客服人員,尋求技術支援 (F22) DSP COMM Fault 變流器內部通訊斷線 請確認RS-485連線介面是否正確 (F23) Ground Cur. 1. 請檢查輸入端的絕緣 High 太陽能模組與接地隔離阻抗異常 2. 檢查電容值 (+ <-> GND & - <-> GND) , (F24) 必須< 10uF. 必要時安裝外部的變壓器 Iac Unbalance 1.
  • Page 161: 警告訊息(配置端警告)

    錯誤告警及排除問題 6.3 警告訊息(配置端警告) 表 6-3A: 警告訊息 (配置端警告) 資訊顯示 可能原因 故障排除 DC Voltage 輸入電壓低於下限值 請檢查電壓至變流器端的連接 (W01) 1. 確認安裝機器本體及環境溫度 1. 本體及環境溫度過高 2. 確認國別及最大功率限制參數設定 2. 實功功率限制功能作動 3. 確認市電頻率是否異常 3. P-F功能作動 4. 確認市電電壓是否異常 4. P(V) 功能作動 De-rating 5-1. 確認市電電壓是否異常 (W07) 5. 市電電壓過低 5-2. 確認虛功控制功能設定 6. 輸入電壓過低 6.
  • Page 162: 7 技術資料

    技術資料 7 技術資料 表 7-1A: 規格 Model M70A_262 直流輸入 1100 V * 最大輸入電壓 200 - 1000 V 工作電壓範圍 460 - 900 V * MPP 電壓範圍 (全功率) > 250 V 啟動電壓 額定電壓 600 V Each MPPT: 26 A, Total: 156 A 最大輸入電流 Each MPPT: 15.7 kW, 最大輸入功率...
  • Page 163: 表 7-1B: 規格

    技術資料 表 7-1B: 規格 Model M70A_262 效率 98.8 % 最高效率 98.4 % 歐洲效率 資訊 RS-485 / SUB_1G / Wi-Fi (optional) 通訊介面 規範認證 IEC 62109-1/-2 VDE-AR-N 4110 EN 61000-6-2 NB/T 32004: 2018 EN 61000-6-3 GB/T 19964: LVRT VDE-AR-N 4105 CNS 15382 VDE 0124-100 一般數據...
  • Page 164: 圖 7-1: 效率曲線圖

    技術資料 Efficiency of M70A Output voltage at 400Vac Efficiency(%) Pn=70kW 100% 520V 600V 800V 100% Output Power (%) 圖 7-1: 效率曲線圖...
  • Page 165: 圖 7-2: 環溫對應降額曲線圖(Pf=1)

    技術資料 Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=1 P/Pn(%) Pn=70kW 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) 圖...
  • Page 166: 圖 7-3: 環溫對應降額曲線圖(Pf=0.9)

    技術資料 Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=0.9 P/Pn(%) Pn=70kW 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) 圖...
  • Page 167: 圖 7-4: 環溫對應視在功率降額曲線圖(Pf=1)

    技術資料 Apparent Power Derating Curve with Ambient Temprature Output voltage at 230Vac / 400Vac PF=0.9 S/Sn(%) Sn=70kVA 110% 100% 90 % 80 % 70 % 60 % 460V 520V 50 % 600V 720V 800V 40 % 900V 30 % 20 % Ambient Temperature (°C) 圖...
  • Page 168: 附錄: 組裝說明

    附錄 附錄: 組裝說明 ③ ④ ⑤ ① ② ⑥ 附錄-1: 組裝說明-1 位置 螺絲扭力 10 kgf-cm (0.98N• m) 濾網外蓋 6 kgf-cm (0.6N•m) 風扇托盤 12 kgf-cm (1.2N•m) 天線 10 kgf-cm (0.98N•m) 天線支架 (M4) 落地支架 250 kgf-cm (24.5N•m) 40 kgf-cm (3.9N•m) 設備接地 (M6)
  • Page 169: 附錄-2: 組裝說明-2

    附錄 ③ ① ② ④ ⑤ H4CFC4D-MS H4CMC4D-MS 附錄-2: 組裝說明-2 位置 螺絲扭力 導體橫截面 8.0 kgf-cm (0.8N•m) 內部風扇架 2 6.0 kgf-cm (0.6N• m) 內部風扇組件 2 內部風扇架 1 8.0 kgf-cm (0.8N•m) 6.0 kgf-cm (0.6N•m) 內部風扇組件 1 12/10 AWG (4/6mm²) H4 導線...
  • Page 170: 附錄-3: 組裝說明-3

    附錄 ① ① ④ ⑤ ④ ⑥ ② ③ ③ ② ⑤ ④ 附錄-3: 組裝說明-3 位置 螺絲扭力 導體橫截面 直流側雷擊保護裝置 A: 25 kgf-cm (2.45N• m) G: 8.0 kgf-cm (0.8N •m) 交流側雷擊保護裝置 8.0 kgf-cm (0.8N•m) 交流絕緣蓋 25 kgf-cm (2.45N•m) 鎖扣外蓋 通訊模組 20 AWG (0.5mm²) L1,L2,L3,N 317 kgf-cm (31N•...
  • Page 172 5013282100 Version 01200616...

Table of Contents