Christie DWU951 Service Manual page 74

Multimedia dlp projector
Hide thumbs Also See for DWU951:

Advertisement

DWU951 (DD1-WU80P/81P) / DWX951 (DD1-WX80P/81P) / DXG1051 (DD1-X100P/101P)
Ballast holder
Disassembling
1) Remove 4 screws and slightly
lift and slide the ballast holder.
2) Remove 2 screws to detach the
ballast cable shield.
3) Disconnect CNPF1 on the
POWER UNIT1 BALLAST and
CNPF2 on the POWER UNIT2
BALLAST.
Assembling
1) Connect CNPF1 to the POWER UNIT1 BALLAST, wire it under the ballast cable shield and screw the
shield down.
2) Put the holder in place and screw down.
3) Connect CNLP2 and CNBL2 to the POWER UNIT2 BALLAST.
Wiring
Wire the cables as below.
Wire the cables as below.
Ballast
holder
POWER UNIT1
BALLAST
[CAUTION]
Make sure LAMP1 DOWN FAN and
IRIS FAN cables are not pinched.
DWU951/DWX951/DXG1051 Service Manual
020-000674-01 Rev.1 (01-2014)
Torque: 0.68-0.88N m
[CAUTION]
Make sure CNPF1 is not pinched
by the ballast cable shield
CNPF1
[CAUTION]
Make sure there is no extra length to CNPF1 as
shown in the figure. If there is extra length to
CNPF1, pull in the wire to the POWER UNIT1
CIRCUIT side.
72
T3x12
black screws
OK
NG
Slide the
holder
CNPF1
T3x12
black screws
Torque:
0.68-0.88N m
Ballast
cable
shield