Figure 69. Tightening the cover screw
5. Ensure that both of the power supplies are fully seated into the system. For instructions, see
"Replacing a power supply in the 9183-22X system" on page 118.
6. Reconnect the power cords to the system. For instructions, see "Connecting power cords to the
9183-22X system" on page 113.
7. Restart the system. For instructions, see "Starting the 9183-22X system " on page 103.
8. If you installed or replaced a PCIe adapter, update the adapter firmware.
See Getting firmware fixes for vendor I/O adapters from the vendor website (www.ibm.com/support/
knowledgecenter/POWER9/p9ei8/p9ei8_update_other_adapter.htm).
9. Verify the installed part.
See Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ei3/
p9ei3_verifyrepair.htm).
Starting and stopping the 9183-22X system
Find information about starting and stopping the IBM Power System IC922 (9183-22X) server to perform
a service action or system upgrade operation.
102 Power Systems: Installing the System and Ordered Parts for the IBM Power System IC922 (9183-22X)
Need help?
Do you have a question about the Power System IC922 and is the answer not in the manual?
Questions and answers