Completing inventory for your server
Use this information to complete inventory for your server.
Procedure
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain the order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
• Your IBM reseller.
• IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States
only).
• The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
Removing the shipping bracket and connecting power cords for your preinstalled server
Before you set up a server, you must remove the shipping brackets and connect the power cords.
Procedure
1. Remove the screws that secure the shipping brackets to the chassis.
2. Plug the power cords into the power supplies.
Figure 13. Connecting the power cords to the system
3. Attach all other cables to the rear of the server.
Installing and configuring the 9183-22X 13
Need help?
Do you have a question about the Power System IC922 and is the answer not in the manual?
Questions and answers