Starting the 9183-22X system
You use the power switch to start the system.
About this task
Attention: For safety, airflow purposes and thermal performance, the service access cover must
be installed and fully seated before you power on the system.
You can use this procedure to power on the system, or you can use a console to power on the system.
Procedure
1. Before you press the power-on switch, ensure that the power supplies are connected to the system
unit and verify the following items:
• All system power cables are connected to a power source.
• The power-on LED as shown in the following figure, is flashing. A flashing light indicates standby
power to the unit.
2. Press the power-on switch that is shown in the following figure.
Note: It might take several minutes for the power-on LED to begin flashing. Do not continue to press
the power-on switch.
The power-on LED stops flashing and remains on, indicating that the system power is on. The system
cooling fans first run at a high speed, and after approximately 30 seconds, return to operating speed.
Figure 70. Locating the Power-on switch and Power-on LED
What to do next
If you press the power-on switch and the system does not start, contact your next level of support or your
service provider.
Stopping the 9183-22X system
You can use the power switch or a command to stop the system.
Procedure
• You can press and hold the power switch to stop and power off the system as shown on the following
figure.
Installing and configuring the 9183-22X 103

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power System IC922 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

9183-22x

Table of Contents

Save PDF