Two-Post Flush-Mount Installation - Dell EMC S5232F-ON Installation Manual

Hide thumbs Also See for S5232F-ON:
Table of Contents

Advertisement

Figure 13. 1U tool-less nonthreaded square hole installation
2
Align and seat the front flange pegs in the holes on the front side of the vertical post.
NOTE:
Be sure that the rails click into place and are secure.
3
Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each flange ear and unseat each rail.

Two-post flush-mount installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
NOTE:
For S5296F-ON installation instructions, see
1
Remove the castings from the front side of each ReadyRails assembly, see item 1 in the following illustration. Use a torx screwdriver to
remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for
future rack requirements. Do not remove the back latch castings.
26
S5200F-ON Series switch installation
S5296F-ON four-post rack
assembly.