Power Supplies; Connectors For J7; J3 Configuration: Power-Supply Input - Texas Instruments ADS1282EVM User Manual

Table of Contents

Advertisement

www.ti.com
Pin No.
J5.17
J5.18
J5.19
J5.20
Many pins on J5 have weak pull-up/-down resistors. These resistors provide default settings for many of
the control pins. Many pins on J5 correspond directly to ADS1282 pins. See the
sheet
for complete details on these pins.
4

Power Supplies

J8 is the power-supply input connector.
ADC can be applied directly to the device (see
needed to power the bipolar amplifiers. For optimum noise performance, the external supplies (+VA and
–VA) should be used.
Pin No.
J8.1
J8.2
J8.3
J8.4
J8.5
J8.6
J8.7
J8.8
J8.9
J8.10
4.1
Bipolar Power Options
The voltage used to power the operational amplifiers is +10V and –10V pins J8.1 and J8.2. If using bipolar
mode ±5V supplies must be connected to pins J8.3 and J8.4. The ±5V is regulated down to ±2.5V with
U10 and U13 in bipolar mode. Jumpers must be properly placed across J7.1 and J7.2 as well as J7.3 and
J7.4 to properly power the ADS1282 (shown in
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
Table 2. J5: Serial Interface Pins (continued)
Pin Name
Signal Name
TOUT
CLK
DGND
DGND
GPIO5
EXTCLK
SDA
SDA
Table 3
Section
Table 3. J3 Configuration: Power-Supply Input
Pin Name
+VA
–VA
+5VA
–5VA
DGND
AGND
+1.8VD
VD1
+3.3VD
+5VD
Figure 1. Connectors for J7
Copyright © 2009–2011, Texas Instruments Incorporated
I/O Type
Pullup
In
None
In/Out
None
In
None
2
I
C
n/a
lists the configuration details for J8. Analog inputs to the
8.1, Analog Input). An additional bipolar supply is
Function
+10V to +15V
–10V to –15V
+5V analog supply
–5V analog supply
Digital ground input
Analog ground input
1.8V digital supply
Not used
3.3V digital supply
+5V
Figure
1).
ADS1282EVM and ADS1282EVM-PDK User's Guide
Power Supplies
Function
Can be used to provide
a clock from a
processor
Digital ground
External clock input
2
I
C data
ADS1282 product data
Required
Yes
Yes
Always
No; only for bipolar
mode
Yes
Yes
No
No
Always
No
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS1282EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads1282evm-pdk

Table of Contents