Evm Operation; Ads1282Evm Default Jumper Locations - Texas Instruments ADS1282EVM User Manual

Table of Contents

Advertisement

www.ti.com
8

EVM Operation

This section provides information on the analog input, digital control, and general operating conditions of
the ADS1282EVM.
8.1
Analog Input
The two differential input sources can be applied directly to J6 (top or bottom side) or through
signal-conditioning modules available for the modular EVM system. Each input is connected directly
through an OPA1632 buffer before reaching the ADS1282. The Common-Mode Voltage (V
input buffer operational amplifiers is 2.5V supplied from the REF5025.
8.2
Digital Control
The digital control signals can be applied directly to J5 (top or bottom side). The modular ADS1282EVM
can also be connected directly to a DSP or microcontroller interface board, such as the
EVM
or
HPA-MCU Interface
of the ADS1282EVM-PDK. For a list of compatible interface and/or accessory boards for the EVM or the
ADS1282, see the relevant product folder on the TI web site. Some of the digital signals are controlled
directly with pins on J5. Other signals, such as SYNC, MFLAG, PMODE, and RESET controls, can only
be controlled by U7. These signals are configured and read using the I
The Format and Mode pins can be controlled by both methods (GPIO pins on J5, and the I
U7).
8.3
Default Jumper Settings and Switch Positions
Figure 4
shows the jumpers found on the EVM and the respective factory default conditions for each.
There is only one switch, S1, located on the ADS1282EVM; it is used to set the reference voltage (V
The default position is to the left, indicating that the EVM is to use the onboard reference voltage.
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
boards available from Texas Instruments, or the MMB0 if purchased as part
Figure 4. ADS1282EVM Default Jumper Locations
Copyright © 2009–2011, Texas Instruments Incorporated
2
C signals on pins 16 and 20 of J5.
ADS1282EVM and ADS1282EVM-PDK User's Guide
EVM Operation
) for the
COM
5-6K Interface
2
C control from
).
REF
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS1282EVM and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ads1282evm-pdk

Table of Contents