ADS1281EVM and ADS1281EVM-PDK User's Guide
This user's guide describes the characteristics, operation, and use of the ADS1281EVM, both by itself and
as part of the ADS1281EVM-PDK. This evaluation model (EVM) is an evaluation board for the ADS1281,
a high-performance, 32-bit, single-channel, delta-sigma analog-to-digital converter (ADC). The EVM allows
evaluation of all aspects of the ADS1281. Complete circuit descriptions, schematic diagrams, and bills of
material are included in this document.
The following related documents are available for download through the Texas Instruments web site at
http://www.ti.com.
Device
ADS1281
REF5025
REF5050
OPA2350
OPA1632
PCA9535
ADCPro is a trademark of Texas Instruments.
Microsoft, Windows are registered trademarks of Microsoft Corporation.
SPI is a trademark of Motorola, Inc.
2
I
C is a trademark of NXP Semiconductors.
NI-VISA is a trademark of National Instruments.
All other trademarks are the property of their respective owners.
SBAU143C – March 2009 – Revised May 2011
Submit Documentation Feedback
ADS1281EVM (Left) and ADS1281EVM-PDK (Right)
EVM-Compatible Device Data Sheets
Literature Number
SBAS378B
SBOS410C
SBOS410C
SBOS099C
SBOS286A
SCPS129H
Copyright © 2009–2011, Texas Instruments Incorporated
SBAU143C – March 2009 – Revised May 2011
Device
Literature Number
SN74LVC2G157
SCES207K
SN74LVC1G07
SCES296W
SN74AHCT1G04
SCLS319N
TPS79225
SLVS337B
TPS72325
SLVS346B
ADS1281EVM and ADS1281EVM-PDK User's Guide
User's Guide
1
Need help?
Do you have a question about the ADS1281EVM and is the answer not in the manual?
Questions and answers