Running The Software And Completing Driver Installation; Ni-Visa Driver Installation - Texas Instruments ADS1282EVM User Manual

Table of Contents

Advertisement

www.ti.com
10

Running the Software and Completing Driver Installation

Note: The software is continually under development. These instructions and screen images are current at
the time of this writing, but may not exactly match future releases.
The program for evaluating the ADS1282EVM-PDK is called ADCPro. This program uses plug-ins to
communicate with the EVM. The ADS1282EVM-PDK plug-in is included in the ADS1282EVM-PDK
package.
The program currently runs only on Microsoft Windows platforms of Windows XP; Windows Vista is NOT
supported.
If this is the first time to install ADCPro and the plug-ins, follow these procedures to run ADCPro and
complete the necessary driver installation. Make sure the ADCPro software and device plug-in software
are installed from the CD-ROM as described in
10.1 NI-VISA USB Device Driver Installation
1. After the ADCPro software is installed, apply power to the PDK and connect the board to an available
PC USB port.
2. The computer should recognize new hardware and begin installing the drivers for the hardware.
Figure 9
through
For the first screen,
installed to your PC.
For the remaining steps, accept the default settings.
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
Figure 12
are provided for reference to show the installation steps.
Figure
9, it is not necessary to search for the software; it has already been
Figure 9. NI-VISA Driver Installation
Copyright © 2009–2011, Texas Instruments Incorporated
Running the Software and Completing Driver Installation
Section
9.1, Installing the ADCPro Software.
ADS1282EVM and ADS1282EVM-PDK User's Guide
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS1282EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads1282evm-pdk

Table of Contents