ADS1282EVM-PDK Kit Operation
9
ADS1282EVM-PDK Kit Operation
This section provides information on using the ADS1282EVM-PDK, including setup, program installation,
and program usage.
To prepare to evaluate the ADS1282 with the ADS1282EVM-PDK, complete the following steps:
Step 1. Install the ADCPro software (if not already installed) on a PC.
Step 2. Install the ADS1282EVM-PDK EVM plug-in software.
Step 3. Set up the ADS1282EVM-PDK.
Step 4. Connect a proper power supply or use the included ac adapter.
Step 5. Complete the NI-VISA™ USB driver installation process.
Step 6. Run the ADCPro software.
Step 7. Complete the Microsoft Windows USB driver installation process.
Each task is described in the subsequent sections of this document.
9.1
Installing the ADCPro Software
Do not connect the ADS1282EVM-PDK before installing the software on a
suitable PC. Failure to observe this caution may cause Microsoft Windows to
not recognize the ADS1282EVM-PDK as an connected device.
The latest software is available from the TI website at http://www.ti.com/. The CD-ROM shipped with the
ADS1282EVM may not contain the latest software. The updated ADCPro software can be downloaded
directly from the TI web site (http://www.ti.com/adcpro) or the update check command can be used. Refer
to the
ADCPro User Guide
To install the ADS1282EVM-PDK plug-in, run the file: ads1282evm-pdk-plugin-1.0.0.exe (1.0.0 is the
version number, and increments with software version releases; you may have a different version on the
CD). Double-click the file to run it; then follow the instructions shown. You can also use the ADCPro
Update Check feature to check for newer versions of the ADS1282EVM-PDK plug-in, once you have
installed one version of it.
The software should now be installed, but the USB drivers may not yet have been loaded by the PC
operating system. This step will complete when the ADCPro software is executed; see
Running the Software and Completing Driver Installation.
8
ADS1282EVM and ADS1282EVM-PDK User's Guide
CAUTION
for instructions on installing and using ADCPro.
Copyright © 2009–2011, Texas Instruments Incorporated
Section
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
www.ti.com
10,
Need help?
Do you have a question about the ADS1282EVM and is the answer not in the manual?
Questions and answers