www.ti.com
2. Select ADS1282EVM from the EVM drop-down menu. The ADS1282EVM-PDK plug-in appears in the
left pane, as shown in
Step 2. The ADS1282EVM-PDK plug-in window has a status area at the top of the screen. When the
plug-in is first loaded, the plug-in searches for the board. You will see a series of messages
in the status area indicating this action.
Step 3. If you have not yet loaded the operating system drivers, Windows will display the Windows
Install New Driver Wizard sequence (illustrated in
default settings.
NOTE: During the driver installation, a message may appear indicating the firmware load has timed
out. Click OK and continue driver installation. The plug-in will attempt to download the
firmware again once the driver installation completes.
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
Figure
15.
Figure 15. ADS1282EVM-PDK Plug-In Display Window
Copyright © 2009–2011, Texas Instruments Incorporated
Running the Software and Completing Driver Installation
Figure 16
through
ADS1282EVM and ADS1282EVM-PDK User's Guide
Figure
20). Accept the
17
Need help?
Do you have a question about the ADS1282EVM and is the answer not in the manual?