www.ti.com
11.1.4
Collecting Data
Once you have configured the ADS1282 for your test scenario, press the ADCPro Acquire button to start
the collection of the number of datapoints specified in the Test plug-in Block Size control. The
ADS1282EVM-PDK plug-in disables all the front panel controls while acquiring, and displays a progress
bar as shown in
Figure
For more information on testing analog-to-digital converters in general and using ADCPro and Test
plug-ins, refer to the
11.2 Troubleshooting
If ADCPro stops responding while the ADS1282EVM-PDK is connected, try unplugging the power supply
from the PDK. Unload and reload the plug-in before reapplying power to the PDK.
SBAU144C – March 2009 – Revised May 2011
Submit Documentation Feedback
29.
Figure 29. Progress Bar While Collecting Data
ADCPro User
Guide.
Copyright © 2009–2011, Texas Instruments Incorporated
Evaluating Performance with the ADCPro Software
ADS1282EVM and ADS1282EVM-PDK User's Guide
25
Need help?
Do you have a question about the ADS1282EVM and is the answer not in the manual?
Questions and answers