Running the Software and Completing Driver Installation
Step 4. Once Windows finishes installing the software driver, the plug-in downloads the firmware to
the MMB0. The status area will display Connected to EVM when the device is connected and
ready to use. If the firmware does not load properly, you can try resetting the MMB0 by
pressing Reset and then reloading the plug-in.
Step 5. You can verify the proper installation of the USBStyx driver using the Device Manager. Note
that the first driver item, NI-VISA USB Devices, will disappear and a new item,
LibUSB-Win32 Devices will appear, as
Figure 21. USBStyx Driver Verification Using Device Manager
The driver installation wizard sequence should not appear again, unless you connect the board to a
different USB port.
20
ADS1282EVM and ADS1282EVM-PDK User's Guide
Figure 20. Install New Driver Wizard, Screen 5
Copyright © 2009–2011, Texas Instruments Incorporated
Figure 21
shows.
SBAU144C – March 2009 – Revised May 2011
www.ti.com
Submit Documentation Feedback
Need help?
Do you have a question about the ADS1282EVM and is the answer not in the manual?