Recommissioning; Recommissioning At A Restart - Pilz PMCprotego S2-2 Operating Manual

Safe motion
Table of Contents

Advertisement

Commissioning
7.3

Recommissioning

7.3.1

Recommissioning at a restart

The timing diagram below illustrates the signal sequence of the servo amplifier and safety
card at a restart. The safety card has already been configured (see "Initial commissioning")
Servo Amplifier
24 V
X4/1
L1, L2, L3
X0
X8
Safety Card Sx
24 V
X30/1
SS1 Activate
X30/1
Reset
X30/20
Ready
X30/16
STO Acknowledge
X30/5
Servo Amplifier
STO-ENABLE
HW-/SW-Enable
Enable U, V, W
Motor n
Legend:
}
Servo amplifier
Operating Manual PMCprotego S2-2(-C)
1002529-EN-04
U
0
U
BTB/RTO
X3B/14,15
0
U
0
U
0
U
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
24 V: Supply voltage
BTB/RTO: Relay contact for operational readiness, servo amplifier
L1, L2, L3: Mains voltage
X8: Intermediate circuit
t 1 = 15 ms
t 2 = 500 ms
t 3 = 10 s
t 4 > 100 ms
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pmcprotego s2-2-c

Table of Contents