Section B; Installation - USC LPX Operator's Manual

Automated seed treater
Hide thumbs Also See for LPX:
Table of Contents

Advertisement

Section
Section

Installation

Installation
B
B
The following steps outline the initial set-up of your USC Seed Treating system:
1. Clear the area of bystanders, especially small children, before moving.
2. Be sure there is enough clearance from overhead obstructions and power lines or
other equipment to move the machine into its working position.
3. Using a forklift, place the seed treater in the desired position on a level surface.
USC highly recommends that the seed treater be set up inside a
building or any covered structure to protect the machine from
weathering.
4. Remove any boxes and cords from the drum of the treater.
Inlet
Front
Page 12
LPX AUTOMATED SEED TREATER
HIGH VOLTAGE ~ Always disconnect the power source
before working on or near the control panel or lead wires.
HIGH VOLTAGE ~ Use insulated tools when making
adjustments while the controls are under power.
Permanent installation may require additional electrical cords,
chemical tubing, and air lines, since each installation is unique.
SET-UP
USC,
LLC
Rear
Discharge

Advertisement

Table of Contents
loading

Table of Contents