Operational Procedures; Simple Pod Operation - Fuji Electric POD UG221H-LE4 User Manual

Programmable operation display
Table of Contents

Advertisement

1.

Operational Procedures

Simple POD Operation

Follow the procedure below to operate the Simple POD.
1. Installation and wiring
For more information, refer to "Chapter 3."
2. Connection with devices including a PLC and a temperature controller
For instructions and precautions on wiring between the Simple POD and other devices, refer to the
separate PLC Connection Manual or Temperature Control Network Manual.
3. Simple POD power-on
• New Simple POD
• Other than the above
When the check screen below and then the next user screen are displayed correctly, go to
step 5.
4. Screen data creation and transfer
• New Simple POD
"Initial Screen" (page 6-2)
• Other than the above
Refer to Chapter 5, "Data Transference" in the User's Manual <Operation> (FEH375) .
5. Operation start
The Simple POD becomes operable with a PLC or a computer connected to it.
* If the Simple POD does not operate normally and shows an error message, eliminate the
cause by referring to "Chapter 7."
SYSTEM
F1
F2
F3
F4
F5
POWER
SYSTEM
F1
F2
F3
F4
F5
POWER
1. Operational Procedures
6-1
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pod ug seriesPod ug221h-sr4Pod ug221h-lr4

Table of Contents