Gree GMV5 Series Service Manual page 204

Dc inverter vrf units
Hide thumbs Also See for GMV5 Series:
Table of Contents

Advertisement

6) After a required amount of lubricant is added, close the oil checking valve to ensure tightness.
Oil checking
valve
Low
pressure
check valve
Note: Lubricant is of great importance to the normal running of compressors. You should follow
Gree's requirement to add qualified lubricant of the specified trademark and ensure properness
of fill amount.
Step 14: Vacuum-pump.
After lubricant is added, keep on extracting air through a vacuum pump till the internal pressure reaches
the absolute pressure 0 kgf/cm
moistures inside the pipeline system are completely vaporized.
Vacuum pumps of the specifications below are recommended:
Type
Lubricant driven pump
Lubricant free pump
Open all valves in order that the vacuum pump extracts air through all the valves, during which, connect
the units to a pressure gauge. When the internal pressure reaches 0 kgf/cm
2
reads -1 kgf/cm
, keep on the extraction action for 0.5~1.0 hour more. Finally, turn off the rotary switch of
the gauge and close the pump. One hour later, if the pressure remains the same, fill refrigerant. If the
pressure increases to 0.1 kgf/cm
GMV5 DC INVERTER VRF UNITS SERVICE MANUAL
Extract air through all
valves. In the course of oil
fill, keep on the extraction
action
Connect the rubber hose
to the oil checking valve at
one end and put the other
end of the hose into the
glass for drawing lubricant
Liquid
pipe
2
and the pressure gauge reads -1 kgf/cm
Max. Discharge
Rate
100 L/min
50 L/min
2
or higher, conduct leakage check again.
Balance
pipe
Purpose
For air discharge
Applicable
Applicable
201
Gas
pipe
2
. This is to ensure that
For vacuum drying
Applicable
Applicable
2
and the pressure gauge

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents