Gree GMV5 Series Service Manual page 186

Dc inverter vrf units
Hide thumbs Also See for GMV5 Series:
Table of Contents

Advertisement

GMV5 DC INVERTER VRF UNITS SERVICE MANUAL
6. As shown in the figure below, put the black test probe to pad V (YE) and the red test probe to pad NV
(make sure the moisture proof tape is removed). In normal cases, the multimeter should read 0.39± 0.3 V.
If it is ―0‖ or infinitely great, the IPM module is faulty.
183

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents