Gree GMV5 Series Service Manual page 121

Dc inverter vrf units
Hide thumbs Also See for GMV5 Series:
Table of Contents

Advertisement

GMV5 DC INVERTER VRF UNITS SERVICE MANUAL
For the phase with "OK" displayed, a manual confirmation is required for entering the next
commissioning step. Click "
" to display relevant information detected on this phase, which provides
references for selection. Click "Close" to close the information (the number of commissioning units is
displayed in "3 Confirm ODU Basic Module NO." and "4 Confirm IDU NO."; the preheating period is
displayed in ―8 Compr. Preheat Confirmation").