Connecting Devices To The Projector And Establishing Communication; Projector Head Connections And Status Leds - Christie CP2308-G Installation And Setup Manual

Hide thumbs Also See for CP2308-G:
Table of Contents

Advertisement

Connecting devices to
the projector and
establishing
communication
To display content, you must connect a device that is capable of storing or playing content to the
projector.

Projector head connections and status LEDs

Understand the inputs on the projector.
A
AES3 port for digital audio output.
B
Linear Time Code (LTC) output.
C
Output for multi-projector playback.
D
Input for multi-projector playback (Christie IMB to Christie IMB only).
E
LED status indicators:
• SM —The LED flashes green when the security manager (SM) is running correctly.
• FIPS—The LED is green when the FIPS (Federal Information Processing Standards Publications)
security status is operating correctly. If the LED is red, an error has occurred. Restart the Christie
IMB. If the LED remains red, return the Christie IMB to Christie Digital Systems USA Inc.
CP2308-G Installation and Setup Guide
020-102866-01 Rev. 1 (05-2018)
Copyright
2018 Christie Digital Systems USA, Inc. All rights reserved.
©
21

Advertisement

Table of Contents
loading

Table of Contents