Replacement Procedure

Binding Post Sgl Replacement

Binding Post Sgl Replacement

Tools Required

Removal Procedure

Refer to
Step 1. Remove the 3/4 Rack Module Top as described in
Replacement" on page
Step 2. Remove the A3 Analog Daughter Board as described in
Board Replacement" on page
Step 3. Remove the A2 Analog Board as described in
on page
Step 4. Remove the Front Panel as described in
page
Step 5. Remove the 3/8 inch nut (item 1) and washer (item 2) fastening the Binding
Post Sgl.
Step 6. Slide the Binding Post Sgl (item 3) from the Front Panel Assembly.
Replacement Procedure
Step 1. Reverse the order of the removal procedure.
When you fasten the Binding Post Sgl with the 3/8 inch nut and washer,
set box torque wrench's torque to 17.4 in-lb.
Keysight E4980A/E4980AL Precision LCR Meter
Torque screwdriver, TORX T10
Torque screwdriver, TORX T20
Box torque wrench, 7 mm
Box torque wrench, 5/8 inch
Box torque wrench, 3/8 inch
Figure 6-16
for this procedure.
73.
79.
81.
"3/4 Rack Module Top
77.
"A2 Analog Board Replacement"
"Front Panel Assembly Removal" on
"A3 Analog Daughter
103