Performance Test; Introduction - Keysight E4980A Service Manual

Precision lcr meter
Hide thumbs Also See for E4980A:
Table of Contents

Advertisement

Keysight E4980A/E4980AL Precision LCR Meter
Service Guide
2

Performance Test

This chapter provides the outline of the E4980A/ E4980AL performance tests.

Introduction

This chapter provides the performance tests outline for Keysight E4980A/
E4980AL. The performance test names are listed in
descriptions are described sequentially in the following pages.
Allow the analyzer to warm up for at least 30 minutes before you execute
any of the performance tests.
Perform all performance tests in an ambient temperature of 23 ± 5 °C
The performance tests should be performed periodically. The
recommended test interval is 12 months.
The test interval depends on maintenance and the environmental
conditions under which the instrument is used. You may find that the
interval could be shortened or lengthened; however, such a decision
should be based on substantial quantitative data.
Table 2-1
List of the E4980A/ E4980AL performance tests
Para.
1
2
3
4
5
6
Title
Frequency Accuracy Test
DC Source Level Accuracy Test
DC Bias Level Accuracy Test
DC bias V Level Monitor Accuracy Test
DC bias I Level Monitor Accuracy Test
AC Signal Level Monitor Accuracy Test
21
Table
2-1. The test

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4980al

Table of Contents