Installing Leveling Feet
Introduction
Leveling Feet
Installation Procedure
2-9317-370-00-0
Prior to operation, the shipping legs must be replaced with leveling legs. The
leveling legs are contained in the cardboard container labeled "Documentation
Package Enclosed".
Install the leveling feet while the system is still elevated on the forklift. Install the
leveling feet by screwing them into the frame where the shipping plates were
removed. The leveling feet should extend approximately 12.5 cm (5 in.) from the
base of the system frame. Be consistent with each leveling foot.
Once the leveling feet are installed, carefully position the system into place for
installation.
Slowly lower the system onto the pads at the site of installation, then remove the
forklift.